Prepare effectively for your USGBC LEED-AP-ND LEED AP Neighborhood Development (LEED ND) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 100 questions

To ensure that future residents of a project are allowed to grow produce in side yards, balconies or rooftops. Neighborhood Pattern and Design Credit. Local Food Production requires a developer to

A.

retain an on-site garden management company.

B.

register the protect with American Farmland Trust.

C.

establish appropriate covenants, conditions, and restrictions.

D.

establish a community supported agriculture program.

A project site is located in a Federal Empowerment Zone What Is also needed to qualify the protect tor Smart Location and Linkage Credit. Preferred Locations Option 3: Designated High-Priority Locations?

A.

Provide 10% of total rental units priced up to 60% area median income (AMI)

B.

Locate the project on an adjacent site that is also a previously disturbed site

C.

Locate the project such that 50% of its dwelling units are within a 1/4 ml.(0.4 km) walking distance of at least seven diverse uses

D.

Use no more than 20% of the total development footprint area for off-street surface parking, with no individual surface parking lot larger than two acres (0.8 hectare)

A city is building a mixed neighborhood which is attempting LEED for Neighborhood Development certification

There are two supermarkets, one former’s market, one bank three restaurants, one laundry and one hair salon within a 1/2 mi. (0.8 km) walking distance of its geographic center. How many uses should be counted when attempting Smart Location & Linkage (SLL) prerequisite?

A.

Five

B.

Six

C.

Eight

D.

Nine

A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?

A.

Provide points of connectivity of 140 street intersections per square mile

B.

Provide a park and ride parking, lot within 150 ft. (46 m) ofthe transit shelter

C.

Display transit schedules and route information at each publictransit stop

D.

Transit agency confirmation that additional weather protected transit shelters will be provided within five years of protect completion.

A seven-story mixed-use project Hasa zoning setback requirement of40 ft. (12 m). street level retail along 75% ofIts block length and an at-grade parking garage entryway along the remaining 25% of the block length. Which ofthe following strategies will improve the project's walkability?

A.

Specify pervious paving

B.

Provide clear ground floor windows

C.

Use Low Impact Development strategies

D.

Locate the project 1/2 mi, (0,8 km) from a bus stop

What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?

A.

Roof decking

B.

Structural floor

C.

Exterior skin and framing

D.

Nonstructural roofing material

The LEED for Neighborhood Development project learn is tabulating the potential number of points. What is the maximum number of points the team can earn through Regional Priority credits?

A.

Two points

B.

Four points

C.

Six points

D.

Eight points

As defined by the Minimum Program Requirements, theLEED project boundary includes the

A.

aggregate of parcels within the project controlled by the project developer

B.

land and water area that is reviewed for certification

C.

project area minus the nonbuildable square footage associated with the protect

D.

total land area of a protect site bordering previously developed parcels.

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

A.

50%

B.

65%

C.

75%

D.

90%

A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total units The site la outside ofwalking distance to transit service.Howcould this project be eligible for Neighborhood Pattern and Design Prerequisite Compact Development?

A.

Dedicate 10% of the total land area as a public park

B.

Place 15% of the total land area in private roads and streets

C.

Include 15% of the total land area as a protected community open space easement

D.

Include a recreation building with a development footprint of at least 1.5 acres (0.6 hectare)