3V0-21.23 VMware vSphere 8.x Advanced Design Free Practice Exam Questions (2025 Updated)
Prepare effectively for your VMware 3V0-21.23 VMware vSphere 8.x Advanced Design certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
An architect is tasked with updating the design of an existing vSphere-based solution for a pharmaceuticals customer. The update will include upgrade to VMware vCenter 8 and VMware vSphere 8 and the creation of a new cluster that will be used for ongoing research projects. The research project that is driving the need for an update includes a number of applications that are latency-sensitive.
The customer has confirmed the following information during the initial workshop:
The customer recently completed a right sizing exercise using VMware Aria Operations that resulted in a number of ESXi hosts becoming available for use.
Each of the VMware ESXi host servers is configured with:
-- 2 x 20-core Intel Xeon CPU sockets
-- 1024 GB RAM divided evenly between sockets
There is no additional budget for purchasing hardware.
After confirming the existing hardware is still listed on the VMware Hardware Compatibility List (HCL), the architect makes the following design decisions with regard to the workload design:
The solution will support a maximum of 20 combined cores and sockets per virtual machine.
The solution will support a maximum of 512 GB RAM per virtual machine.
What should the architect document as justification for these design decisions?
An architect is documenting the design decisions for a new vSphere solution. The following design decision has been made:
Create a separate vSphere cluster for the management workloads
What could the architect include as justification for this design decision?
An architect is designing a backup solution.
Which two statements should be included in the logical design for this solution? (Choose two.)
An architect is responsible for the availability design of a solution.
The following information has been provided:
Virtual machines (VMs) run 8 or less vCPUs
All hosts have a minimum of two NICs per vSphere distributed switch (VDS) connected to separate physical switches
All hosts have a minimum of two host bus adapters (HBAs) connected to separate physical switches
Which three options maximize VM availability in the event of an ESXi host failure? (Choose three.)
An architect is designing the virtual networking components of a vSphere-based solution that will provide an environment for the development of a new latency sensitive stock trading application.
The following information was identified within the initial meeting with the customer:
The customer has vCenter Standard and vSphere Standard licenses left over from a previous project.
The customer's CFO has approved budget for additional purchases, if required.
The following requirements were also identified during the meeting:
The solution must support 500 development workloads concurrently running in the secondary site.
The solution must support the ability to complete all vSphere Operational Management centrally.
The solution must ensure business-critical applications are not impacted by vSphere system-level operations.
Given the requirements, the architect has decided on a single 20-node cluster for development.
Which three additional design decisions should the architect make to meet these requirements? (Choose three.)
An architect is tasked with creating a design for a vSphere-based solution.
Reviewing requirements with the security team, the architect makes the following design decision:
ESXi hosts in the environment will enable shell sandbox for SSH connections and the local ESXi shell
What is an implication of the design decision to enable shell sandboxing?
An architect is holding a requirements workshop with a customer for a new vSphere solution design. The customer states that the solution should make it easy to identify and apply patches or updates to ESXi hosts, including the ability to pre-stage the files on the ESXi hosts.
Which design quality is being referenced by the customer?
An architect is responsible for designing a vSphere-based solution for a customer. The customer has the following requirements:
The solution must provide redundancy and load balancing for storage traffic
The solution must tolerate at least one failure
There must be no single point of failure in the solution
Which three considerations regarding physical host design should the architect analyze when making storage related design decisions? (Choose three.)
Following a review of security requirements, an architect has confirmed the following requirements:
REQ001- A clustered firewall solution must be placed at the perimeter of the hosting platform, and all ingress and egress network traffic will route via this device.
REQ002- A distributed firewall solution must secure traffic for all virtualized workloads.
REQ003- All virtualized workload, hypervisor, firewall and any management component system events must be monitored by security administrators.
REQ004- The hosting platforms security information and event management (SIEM) system must be scalable to 20,000 events per second.
REQ005- The hosting platforms storage must be configured with data-at-rest encryption.
REQ006- The hosting platform limits access to authorized users.
Which three requirements would be classified as technical (formerly non-functional) requirements? (Choose three.)
An architect is tasked with designing the VMware Validated Solutions in an existing VMware Cloud Foundation environment.
The design must meet the following requirements:
Must not allow logical networks to span physical network boundaries or locations
Must support static routing
What should the architect recommend based on these requirements?
An architect is creating the design for a vSphere platform that will be used as the target for a migration from multiple legacy vSphere platforms that are being decommissioned. The customer has provided the following information:
Each legacy platform has its own set of virtual machine templates stored in OVF format.
All of the templates need to be migrated to the new platform.
After migration, the templates should be centralized into a single location.
The templates must be accessible to all clusters in the new platform vCenter instance.
Any new templates added to the central location must be automatically available to all clusters.
Administrators must be able to deploy new virtual machines directly from the template instances.
The customer also confirmed that after the migrations are complete, the new platform will be the only vSphere solution available.
Which design choice should the architect evaluate in the logical design for the storage and management of virtual machine templates?
Which is a benefit of using vSAN stretched clusters in VMware Cloud Foundation?
A company has the requirement of ensuring that business-critical applications have the necessary network bandwidth to function optimally and maintain a consistent quality of service (QoS).
Which statement would be included in the logical design to support this requirement?
What are two benefits of the VMware Validated Solutions? (Choose two.)
An architect will be updating an existing vSphere data center design.
The following information has been provided:
The new design must carry over existing VLANs for workloads.
The networking for storage must not share the data path with workload traffic.
The new design must be able to add additional VLANS.
The new design must reduce management overhead.
The new replacement servers have two 100 GB network cards.
Which design will meet the requirements for existing workload networks and allow scaling of additional networks?
An architect is documenting the design for a new multi-site vSphere solution. The customer has informed the architect that the workloads hosted on the solution are managed by application teams, who must perform a number of steps to return the application to service following a failover of the workloads to the secondary site. These steps are defined as the Work Recovery Time (WRT). The customer has provided the architect with the following information about the workloads:
Critical workloads have a WRT of 12 hours
Production workloads have a WRT of 24 hours
Development workloads have a WRT of 24 hours
All workloads have an RPO of 4 hours
Critical workloads have an RTO of 1 hour
Production workloads have an RTO of 12 hours
Development workloads have an RTO of 24 hours
The customer has also confirmed that the Disaster Recovery solution will not begin the recovery of the development workloads until all critical and production workloads have been recovered at the secondary site.
What would the architect document as the maximum tolerable downtime (MTD) for each type of workload in the design?
What is a benefit of using workload domains in VMware Cloud Foundation?
An architect is documenting the design for a new vSphere cluster. The customer provides the following information:
All ESXi hosts will use hardware from the same vendor
All ESXi hosts will be monitored for hardware related issues using the vendor's monitoring tooling
The vendor's monitoring tooling provides a plugin for vCenter to allow the hardware status to be visible
The customer also informs the architect of the following requirements:
Workloads must be automatically relocated to other hosts in the event that a host hardware is marked as degraded.
Workloads must be automatically restarted on other hosts in the event of a host failure.
What should the architect include in the design to meet these requirements?
A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.
Which statement would be included in the physical design to support this requirement?
An architect is responsible for designing a vSphere-based solution for a customer. The customer has the following requirement:
There should be no single points of failure within the solution.
Which three considerations regarding physical host design should an architect analyze when making network teaming-related design decisions? (Choose three.)