Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

CTFL_Syll2018 iSQI ISTQB Certified Tester Foundation Level (Syllabus 2018) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your iSQI CTFL_Syll2018 ISTQB Certified Tester Foundation Level (Syllabus 2018) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 6
Total 365 questions

Which of the following BEST describes exploratory testing?

A.

Exploratory testing is a suitable test technique which may replace both black-box and white-box test techniques

B.

Exploratory testing requires both solid specifications and much project time available for test execution

C.

Exploratory testing Is a valid and useful black-box test technique since it focuses on test cases related to the architecture and design of a system

D.

Exploratory testing may be used within defined time periods, during which the tester may follow a lest charter as a guide

Which of the following statements about Use Case Testing is FALSE?

A.

Use case generally has a mainstream scenario and may have many alternate or exceptional scenarios.

B.

A use case can be defined at the abstract level, detached from the implementation, or at the system level, describing a set of executed functions

C.

Use case testing does not find defects caused by interaction of different components

D.

Each use case has preconditions which need to be met for the use case to work successfully

Which of the following does NOT represent one of the three triggers for maintenance testing an operational system?

A.

Data migration

B.

System retirement

C.

System modification

D.

Introduction of a test management tool

Consider the following excerpt from a defect report:

To recreate the failure we used test file TST_01_TC_16.dat which is available in the common shared folder''.

Which incident report objective does this excerpt satisfy?

A.

Provides developers with information to isolate the failure

B.

Provides ideas for test process improvement

C.

Does not belong in an incident report.

D.

Provides test leaders with information to report test progress

Which of the following are benefits of an independent test team, and which are drawbacks?

a) Independent testers can find different defects.

b) Developers may put less emphasis on quality.

c) Independent testers can be seen as the reason for delayed projects.

d) Independent testers can verify assumptions made during the specification of a system.

A.

a and b are benefits, c and d are drawbacks.

B.

b and c are benefits, a and d are drawbacks.

C.

a and d are benefits, b and c are drawbacks.

D.

c and d are benefits, a and b are drawbacks.

Which of the following activities is appropriate to the test planning stage?

A.

Analysing the test basis

B.

Assigning resources for the planned activities

C.

Designing the test environments

D.

Writing a test execution schedule

Which of the following options BEST explain the pesticide paradox principle of testing?

A.

If we do not regularly review and revise our tests, we'll stop finding defects

B.

Repeatedly running a set of tests will ensure that a system is defect free

C.

Defects are, paradoxically, often contained in a small number of modules

D.

Testing, like spraying pesticide, is an effective bug / defect removal activity

Given the following examples of entry and exit criteria:

1. A defined level of code coverage has been achieved

2. The test automation tool has been installed and properly configured

3. The number of unresolved defects is within the predefined limit

4. The performance test environment has been set-up and is available

5. The user stones hove proper acceptance criteria defined

6. The testing budget has been spent and the project sponsor bears the risk of not testing any further

Which of the following BEST categorizes them as entry and exit criteria:

A.

Entry criteria - 1, 3. 4; Exit criteria - 2. 5. 6

B.

Entry criteria - 2. 4. 5; Exit criteria - 1. 3, 6

C.

Entry criteria - 2. 4: Exit criteria - 1. 3. 5. 6

D.

Entry criteria - 2, 4. 5, 6; Exit criteria -1.3

Agile development can be classified as which life cycle model?

A.

Agile development is not related to any life cycle model

B.

RAD

C.

V model

D.

Iterative Incremental .

An airline's frequent flyer's club awards benefits depending on which tier a customer is in. The software must determine which tier to allocate a customer to based on an input value of total Credits Earned to date

Customers initially join the Silver Tier and remain in that tier for the first 400 Credits Earned The next 400 Credits Earned moves the customer into the Gold Tier. The next 600 Credits Earned moves the customer into the Platinum Tier Further Credits Earned moves the customer into the Concierge Tier.

Test Cases have been written with the following total Credits Earned input values:

TC1 -400 Credits

TC2 - 500 Credits

TC3 - 800 Credits

TC4-1500 Credits

Applying the Equivalence Partitioning test design technique, what percentage of valid Equivalence Partitions have these 4 test cases collectively achieved?

A.

25%

B.

50%.

C.

75%.

D.

100%

What type of testing is important after Migration, retirement or enhancement of an existing system?

A.

Regression testing

B.

Operational acceptance testing

C.

System Testing

D.

Maintenance testing

Which of the following statements about test reports are TRUE?

I. Test reports shall be approved by the test team.

II. Test reports shall give stakeholders information as basis for decisions

III. Test reports shall summarize what happened through a period of testing,

IV. Test reports shall be approved by the development team, the test team and the customer

V. Test reports shall include information about remaining risks.

A.

II,1V

B.

II. III. IV

C.

I, III. V

D.

II, III. V

Which of the following is NOT a valid use of decision coverage?

A.

Checking that all decisions have been exercised in a single program

B.

Checking that all decisions have been exercised in a business process

C.

Checking that all calls from one program module to another have been made correctly

D.

Checking that at least 50% of decisions have been exercised by a test case suite

Which of the following statements is the BEST example of non-functional testing?

A.

Tests based on the internal structure of a component or system

B.

Tests related to -what' the system should do

C.

Tests which calculate overtime pay for those employees entitled to such

D.

Tests which capture the time it takes to save a file

Given the following review process main activities and specific review activities:

a. Planning

b. Initiate review

c. Issue communication and analysis

d. Fixing and reporting

1. Creating defect reports

2. Estimating effort and timeframe

3. Recording updated status of defects

4. Selecting the people to participate

5. Distributing the work product and other material

6. Evaluating the review findings

Which of the following BEST matches the review process main activities with the appropriate specific review activities?

A.

2-a, 5-a, 1-b, 4-b, 3-c, 6-d

B.

2-a, 4-a, 5-b, 6-c, 1-d, 3-d

C.

1-a, 4-b, 5-b, 6-c, 2-d, 3-d

D.

2-a, 4-b, 5-c, 1-d, 3-d, 6-d

The decision table above reflects a golf club's pricing structure for green fees and buggy/cart hire.

What is the expected result (actions) for each of the following two test cases (TC1 and TC2)?

* TC 1 - Paul is not a full member, is a Loyalty Card holder and requests to play 18 holes with a buggy/cart

* TC 2 - Cheryl is not at full member, doesn't have a Loyalty Card and requests to play 9 holes with a buggy/cart

A.

TC1 - £23 total charges including buggy hire; TC2 - £21 total charge including buggy hire

B.

TC1 - £18 total charges including buggy hire; TC2 - £16 total charge but no buggy allowed

C.

TC1 - £23 total charges including buggy hire; TC2 - £16 total charge but no buggy allowed

D.

TC1 - £17 total charges but no buggy allowed; TC2 - £21 total charge including buggy hire

Which of the following is a defect that is more likely to be found by a static analysis tool than by other testing techniques?

A.

Omission of a major requirement

B.

Inadequate decision coverage

C.

Component memory leakage

D.

Variables that are not used improperly declared

Out of the following, what is not needed to specify in defect report?

A.

How to fix the defect

B.

Severity and priority

C.

Test environment details

D.

How to reproduce the defect

Which of the following test techniques is structure-based?

A.

Control flow testing

B.

Use case testing

C.

State transition testing

D.

Decision table testing

Which of the following statements is correct?

A.

Pair programming is done with developer and tester pairing together

B.

Pair programming is an alternative term for code inspection.

C.

Pair programming is used usually in waterfall model

D.

Pair programming is, among other things, an informal review method.

Page: 2 / 6
Total 365 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved