TMMi-P_Syll2.1 iSQI TMMi Test Maturity Model Integration Professional (TMMi-P) Free Practice Exam Questions (2025 Updated)
Prepare effectively for your iSQI TMMi-P_Syll2.1 TMMi Test Maturity Model Integration Professional (TMMi-P) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
How does TMMi support test process improvement in an Agile context?
Which of the following is a TMMi level 5 process area?
A test organization is at TMMi level 4 and is trying to implement the TMMi level 5 process areas. One of the improvement goals for the current year is to implement a Defect Prevention program.
Which of the following specific practices needs to be addressed as part of the Defect Prevention process area?
Study the following description:
“Testing is a thoroughly defined, well-founded and measurable process. Testing is perceived as evaluation; it consists of all lifecycle activities concerned with checking products and related work products.”
To which TMMi maturity level does this description apply?
Which process area are you be targeting when implementing the specific practice Define product risk categories and parameters?
What is the correct order for the following TMMi maturity levels (from low to high maturity)?
Which of the following is NOT a TMMi level 2 Process Area?
Consider the following five statements about TMMi level 2 process areas in an Agile context. Which of these statements are true, and which ones are false?
a. Test performance indicators in an Agile context at TMMi level 2 are always more related to team performance (for example, Velocity) than to the end-results of iterations (such as escaped defects).
b. The product risk assessment process for Agile projects will normally take a more lightweight approach than with a sequential lifecycle model.
c. The process area Test Monitoring and Control in an Agile context is not as important as in a traditional methodology, since sticking to a rigid plan is not one of the tenets of the Agile manifesto nor one of the principles of Agile.
d. For TMMi in an Agile project, it is not necessary to have traceability between requirements, test conditions and tests, because test conditions are not part of an Agile methodology.
e. Following the principles of Agile development, the specification of test environments is normally performed closer to test execution than in a sequential methodology, to provide the opportunity for late changes to be implemented.
Improvement models can have a staged and/or continuous representation. The TMMi has been developed as a staged model. Which of the following statements is NOT true regarding a staged model?
Which of the following statements is TRUE regarding relevance of the CMMI model version 2 for testing?
Which of the following statements BEST describes a relationship between the TMMi model and the CMMI process areas Verification and Validation?
Which of the statements about the Learning Phase of the IDEAL improvement framework is the TRUE?
A test process assessment has been performed on a company developing systems for the medical industry. Their systems are classified as safety critical. One of the shortcomings identified during the assessment is related to reliability testing. Although reliability was identified by the business as a critical issue, no formal approach and test techniques are being used for reliability testing.
Which of the following process areas would need specific attention to address the above mentioned shortcoming?
Which of the following statements is TRUE?
The TMMi process area Test Monitoring and Control has a number of specific goals. Which of the following is a specific goal of the Test Monitoring and Control process area?
Which of the following is NOT a specific goal for the process area Non-Functional Testing?
In a TMMi assessment, one of the shortcomings stated was the lack of coherency across various test levels and test types being performed. Establishing a master test plan was an improvement action recommended by the assessors. Which TMMi process area addresses a specific goal and specific practices for establishing a master test plan?
Which of the following statements regarding formal and/or informal assessment is FALSE?
During a TMMi assessment the percentage of process achievement for the Test Policy and Strategy process area has been
determined at 40%.
Which of the following compliance ratings would you assign to the Test Policy and Strategy process area?
Given the following assessment phases:
1. Interview phase
2. Planning phase
3. Preparation phase
4. Reporting phase
Which of following orderings matches the generic assessment process?