Prepare effectively for your AACE International PSP Planning & Scheduling Professional (PSP) Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
The expected remaining cost needed to complete an activity, group of activities or the project is the____________.
The addition of which of the following relationships would cause a logic loop?
What is the primary difference between the arrow diagramming method (ADM) and the precedence diagramming method (PDM)?
Which of the following is NOT input data to the construction planning process?
Assuming conventional finish-to-start relationships, to calculate a schedule retaining the existing logic means that
When resource leveling craft labor for a critical path schedule, the scheduler
What does the narrow band at "Y" represent?
Which of the following phases does NOT describe the commonly accepted construction life cycle?
Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT
In the normal schedule, excluding Activity 1000. what activity(s) are concurrent with Activity 3001?
What activities are concurrent to Activity 2001 in the "normal" schedule?
What is the actual duration as of the status date or data date of Activity B?
In a graphical earned value analysis, what time-scaled value determines the reporting intervals for both schedule and cost performance?
What project cost elements would NOT normally be reflected in the Activity 1000?
Which of the following documents is most likely to be of the LEAST value to a planner/scheduler when planning a contractor's baseline critical path schedule for the construction of a large high-clearance bridge located very near an airport? The contractor has been awarded the contract.
The BEST reason to use multiple calendars is to:
What portion of Activity B is on the critical path?
Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?
If Activity A was delayed 5 days from starting, which of the following adjustments will NOT maintain the completion date of Activity C at Day 40?
Due to a testing delay, release of the product for manufacture is delayed by 5 workdays and the product manual misses its print window at the printer. If the printer is delayed by 10 workdays, what is the delay to produce release?