Month End Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

CTFL4 BCS ISTQB Certified Tester Foundation Level CTFL 4.0 Exam Free Practice Exam Questions (2025 Updated)

Prepare effectively for your BCS CTFL4 ISTQB Certified Tester Foundation Level CTFL 4.0 Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 3
Total 188 questions

Which of the following statements best describes how configuration management supports testing?

A.

Configuration management helps reduce testing effort by identifying a manageable number of test environment configurations in which to test the software, out of all possible configurations of the environment in which the software will be released

B.

Configuration management is an administrative discipline that includes change control, which is the process of controlling the changes to identified items referred to as Configuration Items'

C.

Configuration management is an approach to interoperability testing where tests are executed in the cloud, as the cloud can provide cost-effective access to multiple configurations of the test environments

D.

Configuration management helps ensure that all relevant project documentation and software items are uniquely identified in all their versions and therefore can be unambiguously referenced in test documentation

Metrics can be collected during and at the end of testing activities to assess which of the following?

i. Progress against the planned schedule and budget.

II. Current quality of the test object.

Hi. Adequacy of the test approach.

iv. Effectiveness of the test activities with respect to the objectives.

v. All the above.

Select the correct answer:

A.

Only i and ii.

B.

Only i and iii.

C.

Only I, ii and iv.

D.

Only v.

In which one of the following test techniques are test cases derived from the analysis of the software architecture?

A.

Black-box test techniques.

B.

Experience-based test techniques.

C.

Checklist-based test techniques.

D.

White-box test techniques.

Which of the following s the most correct statement about state testing techniques?

A.

Static techniques can be used before all code is ready for execution

B.

Static techniques find more detects then dynamic techniques.

C.

Static techniques can be used by inexperienced users.

D.

Static techniques are always cheaper than dynamic techniques.

Exploratory testing is an experience-based test technique

A.

Where a developer and a tester work together on the same workstation while the developer actively writes code, the tester explores the code to find defects.

B.

That can be organised into sessions guided by test charters outlining test objectives that will guide the testers' exploration

C.

Where a team of testers explores all possible test techniques in order to determine the most suitable combination of these techniques to apply for a test project.

D.

That aims at finding defects by designing tests that exercise all possible combinations of input values and preconditions

Use Scenario 1 “Happy Tomatoes” (from the previous question).

When running test caseTC_59, the actual result fort = 35degrees Celsius isOUTPUT = Xinstead of the expected output.

Which information should NOT be included in the defect report?

A.

Identification of the test object and test environment

B.

A concise title and a short summary of the defect being reported

C.

Description of the structure of the test team

D.

Expected results and actual results

Which of the following statements best describe Behavior-Driven Development (BDD)?

A.

A collaborative approach that allows every stakeholder to contribute to how the software component must behave.

B.

Expresses the behavior of an application with test cases written in Given When Then format.

C.

Is used to develop code guided by automated test cases.

D.

A psychological technique in which the team's behavior in agile teams is evaluated.

The whole-team approach:

A.

promotes the idea that all team members should have a thorough understanding of test techniques

B.

is a consensus-based approach that engages the whole team in estimating the user stories

C.

promotes the idea that all team members should be responsible for the quality of the product

D.

is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence

The following diagram displays the logical dependencies between requirements and the individual requirement priorities. For example, "R2->R3" means that R3 is dependent on R2. Priority is indicated by the number next to the letter ”P" i.e. P1 has a higher priority than P2.

Which one of the following options best describes the test execution sequence using both requirement dependency and priority

A.

R2. R1, R3. R4. R5, R6. R7, R8.

B.

R1, R2, R3, R4, R5, R6, R7, R8.

C.

R2, R4. R8, R5, R1, R6, R3, R7.

D.

. R2, R1,R3,R7,R6,R5,R4,R8.

The following state transition diagram describes the functionality involved in a system using fingerprint and password authentication to log onto a system.

How many distinct states of the system are visible in the above diagram?

A.

1

B.

2

C.

3

D.

4

Which of the following is not an example of a typical generic skill required for testing?

A.

Be able to apply test-driven development

B.

Be able to use test management tools and defect tracking tools

C.

Be able to communicate defects and failures to developers as objectively as possible

D.

Possess the necessary social skills that support effective teamwork

A requirement specifies that if the total amount of sales (TAS) made during the year by a corporate seller is 300,000€ or more, the bonus that must be paid to the seller is 100% of a certain amount agreed upon at the beginning of the year. The software contains a fault as it implements this requirement with the decision "IF (TAS = 300,000)" instead of "IF (TAS >= 300.000)". The application of the 3-value boundary value analysis to this problem consists of the following three test cases (TAS is an integer variable):

TC1 = 299,999 TC2=300,000 TC=300,001

Which of the following statements is TRUE?

A.

TC1 would highlight the fault

B.

TC2 would highlight the fault

C.

TC3 would highlight the fault

D.

None of the three test cases would highlight the fault.

Which ONE of the following options corresponds to an activity in the testing process in which testable features are identified?

A.

Test design

B.

Test analysis

C.

Test implementation

D.

Test execution

Which ONE of the following statements would you expect to be the MOST DIRECT advantage of the whole-team approach?

A.

Capitalizing on the combined skills of business representatives, testers, and developers working together to contribute to project success.

B.

Reducing the involvement of business representatives because of enhanced communication and collaboration between testers and developers.

C.

Avoiding requirements misunderstandings that may not have been detected until dynamic testing when they are more expensive to fix.

D.

Having an automated build and test process, at least once a day, that detects integration errors early and quickly.

Which of the following statements about TDD, BDD and ATDD is TRUE?

A.

Refactonng is a practice that is an integral part of TDD and is applied both to tests and to code wntten to satisfy those tests.

B.

ATDD is a black-box test design technique that is applicable exclusively at acceptance test level.

C.

BDD is a developer practice where business stakeholders are not usually involved as the tests are directly written at unit/component test level.

D.

ATDD is the practice of running the automated acceptance tests as part of a continuous integration process.

Select the roles required in a formal review:

A.

Author, Management, Facilitator, Review Leader, Reviewers, Scribe

B.

Author, Tester. Facilitator. Review Leader. Reviewers. Scribe

C.

Author, Business analyst. Facilitator, Review Leader. Reviewers. Scribe

D.

Author. Developer, Facilitator. Review Leader. Reviewers. Scribe

Page: 3 / 3
Total 188 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved