Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

D-PSC-MN-01 EMC Dell PowerScale Maintenance Exam Free Practice Exam Questions (2025 Updated)

Prepare effectively for your EMC D-PSC-MN-01 Dell PowerScale Maintenance Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 101 questions

An SSD has failed in Node 1 in a Dell EMC PowerScale F200 cluster. After replacing the drive, which command should be run to ensure the node has finished updating?

A.

Isi devices -d

B.

Isi status -h

C.

Isi devices device list –node-Inn 1

D.

Isi status -q

What type of NIC can be used for the external network on a Dell PowerScale F600 node?

A.

1/10 GbE

B.

10/100 GbE

C.

10/25 GbE

D.

25/40 GbE

An engineer replaced a failed node in a PowerScale H500 due to hardware issues. They must verity that the replacement node is functioning correctly.

What is a crucial step when replacing the failed node in the cluster?

A.

Run a diagnostic test on the replacement node.

B.

Confirm that the replacement node inherits the old serial number from the cluster.

C.

Verify the size of the storage capacity of the replacement node.

D.

Power on the replacement node and ensure it connects to the network without any problems.

A platform engineer is tasked with adding F600 nodes to an existing Dell EMC PowerScale cluster. After racking and stacking the F600 nodes, they determine that the cluster contains X210 and H400 nodes.

What should the platform engineer consider?

A.

H400 nodes cannot co-exist with the F600 nodes in the same cluster

B.

The F600 must use InfiniBand for internal network communication

C.

F600 nodes cannot co-exist with X210 nodes in the same cluster

D.

The cluster must be upgraded to Ethernet back-end topology

A platform engineer has created a cluster of 8 F200 nodes. A requirement is for each power supply on each node to supply power to the respective node equally.

What must the platform engineer do to meet the requirement?

A.

Run the isi config and change the settings in the config subsystem

B.

Cable each node power connection to a different PDU in the rack

C.

Use the iDRAC settings on each node to disable the hot spare feature

D.

Run the isi set -n command to change the power supply behavior

Which slot on the R640 hardware is used for front-end connectivity on a Dell EMC PowerScale F600 node?

A.

PCIe Slot 3

B.

rNDC Slot

C.

PCIe Slot 1

D.

PCIe Slot 2

A platform engineer must replace a failed chassis on a Dell PowerScale Gen6 cluster. What must the engineer do after powering off the nodes?

A.

Remove the drive sleds, label them for identification, and place the drive sleds In the newly installed chassis.

B.

Remove the drive sleds and motherboard and transfer them to the new chassis.

C.

Remove the drives and compute modules and reimage each drive before installing them in the chassis.

D.

Remove the drives, install the chassis, and place the drives in the new chassis.

A company must ensure their PowerScale cluster can handle many active client connections. What must they do when designing their system?

A.

Include a Leaf-Spine backend network

B.

Use the P100 node.

C.

Add maximum RAM in each node.

D.

Add L3 cache to the nodes.

Which Dell EMC PowerScale Gen 6 components are considered CRUs?

A.

SSD, power supply, fan, and bezel

B.

Back-end switch, power supply, disk drive, and bezel

C.

SSD, power supply, disk drive, and bezel

D.

SSD, memory card, disk drive, and bezel

What must be replaced at the same time the backup battery is replaced?

A.

M.2 card and backup battery

B.

Both NIC cards

C.

Riser card

Page: 2 / 2
Total 101 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved