Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

D-VXR-DY-23 EMC Dell VxRail Deploy 2023 Free Practice Exam Questions (2025 Updated)

Prepare effectively for your EMC D-VXR-DY-23 Dell VxRail Deploy 2023 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 102 questions

The VxRail Deployment Wizard is being used on a VxRail cluster with a customer-supplied VDS. Which settings must be used to ensure successful installation?

A.

Use the VxRail vCenter Server

Upload a configuration file (JSON)

B.

Join an external vCenter Server

Use the step-by-step method

C.

Use the VxRail vCenter Server

Use the step-by-step method

D.

Join an external vCenter Server

Upload a configuration file (JSON)

What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-5 (Erasure Coding)?

A.

3

B.

4

C.

5

D.

6

Match each VxRail API request with the information to be retrieved.

A VxRail cluster 4.7.xxx environment is managed by the internal vCenter Server. An implementation engineer plans to deploy a new VxRail cluster using the existing vCenter Server instance, then use the

customer-supplied VDS to manage both VxRail clusters.

What must be done?

A.

Migrate the internal vCenter Server to an external vCenter Server, then merge the PSC

B.

Upgrade the VxRail version from 4.7.xxx to 7.0.000

C.

Migrate the internal vCenter Server to an external vCenter Server, then upgrade the VxRail 4.7.xxx to 7.0.100

D.

Upgrade the internal vCenter Server to version 7.0

An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?

A.

Service laptop must be on the same IP network as the iDRACs

B.

At least 36 in (92 cm) clearance exists in front of and behind the cabinet

C.

Power distribution must support the power rating of a single node

D.

Single power zone must be used with adequate power cables

What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?

What are the requirements for a customer-supplied VDS in a VxRail deployment?

A.

4 or 8 uplinks

Port groups for Discovery, Management, vMotion, and vSAN only

B.

2 or 4 uplinks

Port groups for Discovery, Management, vMotion, and vSAN only

C.

2 or 4 uplinks

Port groups for Discovery, Management vCenter Server, vMotion, and vSAN

D.

4 or 8 uplinks

Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN

Which VxRail model(s) has a non-mirrored IDSDM?

A.

D560/F

B.

All G Series

C.

S570

D.

All E Series

An implementation engineer needs to validate the VxRail network configuration. Where can they obtain the NVT for VxRail?

A.

Dell Technologies Central

B.

Dell Technologies Information Hub

C.

Dell VxRail Expert Channel

D.

Dell VxRail Fast Pass

What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?

A.

Latency and bandwidth measurement to the witness host

B.

Network configuration and performance for vSAN

C.

Network performance for virtual machines

D.

Latency measurement between DCs for Stretched Clusters

Page: 2 / 2
Total 102 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved