Month End Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

CDCP Exin Certified Data Centre Professional (CDCP) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your Exin CDCP Certified Data Centre Professional (CDCP) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 88 questions

What is a disadvantage of a Dynamic UPS?

A.

They are heavy and more noisy.

B.

It needs a separate back-up generator as their autonomy time is less than 60 seconds.

C.

It needs additional cooling infrastructure as high temperatures reduces the lifetime of a Dynamic UPS.

D.

They are only available for small to medium sized data centres, due to their limited capacity of 200 kVA

Which one of the following is a factor that can affect Availability and Reliability?

A.

Inadequate Cooling

B.

Employee Salaries

C.

Radio Active Waves

D.

Attenuation

When designing a data centre with a raised-floor setup, where should the air conditioners be placed?

A.

Perpendicular to the hot aisle

B.

Perpendicular to the cold aisle

C.

Close to the entrance door to create an air curtain to avoid hot comes into the computer room

D.

Perpendicular to the side of the rack

Which one of the following is an AC Power Quality Anomaly?

A.

Signal Distortion

B.

Waveform Distortion

C.

Backup Condition

D.

Attenuation

Which one of the following represents the three elements (oxygen, heat and fuel) to interact in order for the fire to exist?

A.

The Fire Hexagon

B.

The Fire Class

C.

The Fire Triangle

D.

The Fire Technology

Which one of the following is the last stage in Stages of Combustion?

A.

Visible Smoke

B.

Intense Heat

C.

Incipient

D.

Flaming Fire

Which Class of Fires involves energized electrical equipment?

A.

Class A

B.

Class B

C.

Class C

D.

Class K

An optical fiber cable comes with the specifications 50/125 um.

What do the numbers represent?

A.

The first number represents the distance for a 10 Gb/s connection; the second number represents the distance for a 1 Gb/s connection.

B.

The first number represents the diameter of the core; the second number represents the diameter of the cladding in microns.

C.

The first number represents the diameter of the core; the second number represents the actual diameter cable including the buffer and jacket.

D.

The first number represents the required distance to single-phase power cabling; the second number represents the required distance to three-phase cabling.

The temperature and humidity values indicated on the display of the Computer room air conditioner unit are the values measured at which point?

A.

It is the average value between the intake and exhaust (outlet) of the air conditioner.

B.

It is the value measured at the intake of the air conditioner.

C.

It is the value measured at the exhaust (outlet) of the air conditioner.

D.

It is the value measured at the front of the rack of the aisle the air conditioner is situated.

Which one of the following is used in Measuring Business Value?

A.

Regeneration Cost

B.

Scalability

C.

Reliability

D.

Upfront Cost

Which type of copper wire is used for grounding the racks to the SRG?

A.

Thin copper cable to keep the cost low for grounding.

B.

Thick copper cable to create better grounding.

C.

Braided copper wire or flat copper strip.

D.

Copper cable with plastic insulation (isolation).

Which design consideration should be implemented with an Inergen-based fire suppression system?

A.

Install protective covers around the nozzles to avoid accidental gas dumps.

B.

Install the gas containers (tanks) close to the data centre.

C.

To use Inergen only for fires which are not related to electrical power.

D.

Pressure relief valves are required in the room that needs protection.

What factor should be considered when placing fluorescent lighting in the data centre?

A.

Fluorescent lights should not be connected to the back-up generator.

B.

Fluorescent lights should only be installed in equipment supporting areas and not in the Computer/Server room.

C.

Fluorescent lights should not be connected to the mains power supply.

D.

Fluorescent lights should not be connected to the same UPS that supports the ICT equipment.

Mean time between failures is best considered a measure of:

A.

Size

B.

Cost

C.

Duration

D.

Reliability

A UPS has an internal battery tester, do you still need to separately test the batteries at block level?

A.

No, as mentioned the battery tester is already built-in the UPS.

B.

No, the UPS will automatically generate and alarm when de battery voltage is too low to operate.

C.

Yes, the UPS will only test the batteries at string level which only gives an indication on the overall status of the battery string. Measurements at block level will provide more detailed information on the status and remaining lifetime of the batteries itself.

D.

Testing batteries using the built-in battery tester or resting the batteries at block level does not increase the battery lifetime, therefore it is not recommended.

Which one of the following does a Physical Infrastructure consists of in a Data Centre?

A.

Hub

B.

Switch

C.

Rack

D.

Server

When having two non-synchronized power sources, the ATS / STS need to be of the type:

A.

Break before make.

B.

Make before break.

C.

Both make before break or break before make can be used.

D.

Both an ATS and STS can never handle two non-synchronized sources.

The three elements of the fire triangle are,and. (Choose three.)

A.

Oxygen

B.

Earth

C.

Heat

D.

Water

E.

Fuel

Does unplanned downtime of a data centre have an impact on the business results?

A.

No, because data centres operate independently from the business.

B.

No, unplanned data centre downtime is already financially planned for in the yearly budget planning process.

C.

Yes, data centre downtime can result in business downtime.

D.

Yes, but data centre downtime only impacts the airline industry.

The termination of the ability of a product to perform its required function can be defined as.

A.

Failure

B.

Termination

C.

Hindrance

D.

Obstacle

Page: 1 / 2
Total 88 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved