Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

ICBB IASSC Lean Six Sigma – Black Belt Free Practice Exam Questions (2025 Updated)

Prepare effectively for your IASSC ICBB IASSC Lean Six Sigma – Black Belt certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 5 / 5
Total 300 questions

One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X’s) and is commonly shown as which formula?

A.

Y = Z(X2)

B.

Y = f(X3)

C.

Y = f(Xn)

D.

Y = g(X+ 1.5)

Kaizens or Kaikakus and Six Sigma projects are intended to create breakthrough, significant process improvement versus minor, incremental improvements.

A.

True

B.

False

When analyzing the behavior of our process to assess customer satisfaction we are concerned about both the variation such that it stays within the spec limits and how well the Mean is __________________ the process requirements.

A.

Balanced against

B.

Over and above

C.

Twice as great as

D.

Centered relative to

Which of these might contribute to similar distributions having Unequal Variance?

A.

Extreme tails

B.

Outliers

C.

Multiple Modes

D.

All of the above

It would be more likely than not for a Belt conducting a Regression Analysis to find that the _______________________.

A.

r2 value is smaller than the absolute value of r

B.

Correlation Coefficient equals r2

C.

Coefficient of Determination is less than r2

D.

Correlation Coefficient equals r divided by 2

Appropriate measures means that measurements are ______________.

A.

Representative

B.

Sufficient

C.

Contextual

D.

Relevant

E.

All of these answers are correct

The Lean toolbox includes all of these items except ________________.

A.

Mistake Proofing

B.

Visual Factory

C.

Design of Experiments

D.

Inventory Management

Calculate the Rolled Throughput Yield of this process using this data.

DatA. unit input: 1450, unit output: 1390, defects repaireD. 320, scrap: 60

A.

71.33%

B.

72.66%

C.

73.79%

D.

77.93%

If you can Poka-Yoke a defect out of the process entirely then you do not need use SPC on the characteristic of interest in the defect.

A.

True

B.

False

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

A.

Data shift analysis

B.

Outlier analysis methods

C.

Center Line and Control Limits

D.

None of the above

Page: 5 / 5
Total 300 questions