Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

OMG-OCEB2-FUND100 OMG-Certified Expert in BPM 2 - Fundamental Free Practice Exam Questions (2025 Updated)

Prepare effectively for your OMG OMG-OCEB2-FUND100 OMG-Certified Expert in BPM 2 - Fundamental certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 90 questions

Choose the correct answer:

When connecting Flow Objects with Message Flows, which constraint is valid?

A.

Message Flows must be at a 90 degree angle from Sequence Flows.

B.

A Message Flow cannot connect a Pool with a Collapsed Sub-Process.

C.

Message Flows cannot connect to Flow Objects that are within the same Pool.

D.

A Message Flow cannot connect a Message End Event with a Catch-Message Intermediate Event.

Choose the correct answer:

A process normally has steps A, B, C, and D. If step C is not completed within 3 days of the start of the process, immediately end the process with a failure notification.

Which diagram describes this scenario?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Choose the correct answer:

A large energy company is striving to be a process-driven organization and support lean and efficient operations.

Which BMM concept models this description?

A.

A goal

B.

A tactic

C.

A directive

D.

An assessment

Choose the correct answer:

Which is a recognized perspective covered by Balanced Scorecard?

A.

logistics

B.

financial

C.

management

D.

organization

Choose the correct answer:

Which graphic about data objects in BPMN is correct?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Choose the correct answer:

In cost accounting, how are expenses such as electricity and water called?

A.

Labor costs

B.

Variable costs

C.

Overhead costs

D.

Indirect materials costs

Choose the correct answer:

Which is a statement of the goal of the following process?

A.

Designate the unassigned switch with the proper responsibility.

B.

Notify all switches of a pending workload so they can plan their workloads.

C.

Route the incoming request to a switch that has been allocated to a pending project.

D.

Assign the message to the first available switch.

E.

Locate and report information on the status of the incoming tasks to the requesting office.

Page: 2 / 2
Total 90 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved