Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED v5 AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 7
Total 454 questions

In an area where carbon-emission regulations are becoming progressively stricter, the goal is to future-proof the building for complete electrification and eliminate on-site fossil-fuel combustion. Which of the following measures can the project team use to maximize the building’s readiness for electrification while minimizing on-site combustion sources?

A.

Install natural-gas boilers as a backup heating source

B.

Plan for an electric heat-pump water-heating system

C.

Integrate rooftop solar panels to generate renewable electricity on-site

A consultant specifies the required U-value, solar heat gain coefficient, and visible light transmittance for a project. What type of building envelope assembly would require these attributes?

A.

Floors

B.

Roofs

C.

Walls

D.

Windows

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

A.

Retail

B.

Hospitality

C.

Core and Shell Development

D.

New Construction

The intent of the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention is to £

A.

control erosion, noxious odors and landfill waste

B.

control erosion, landfill waste and excessive noise

C.

control erosion, waterway sedimentation and airborne dust

D.

control erosion, waterway sedimentation and noxious odors

Which of the following are all considered regular building occupants?

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

A.

Install glazing with a higher solar heat gain factor

B.

Install photovoltaic panels on the sides of the building

C.

Increase outdoor air intake quantities during summer months

D.

Recover waste energy through exhaust air energy recovery systems

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

A.

At least75% of qualifying land areas within ¾ mile (1.20 km)are previously developed

B.

At least75% of qualifying land areas within ½ mile (0.80 km)are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team ' s top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Which of the following standards is used to perform a Whole-Building Life-Cycle Assessment (LCA) to measure the Global Warming Potential (GWP) of materials in LEED projects?

A.

ISO 21930:2017

B.

ISO 50001:2018

C.

ISO 14044:2006

Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

A.

ASHRAE 55-2010

B.

ASHRAE 62.1-2010

C.

ASHRAE 90.1-2010

D.

ASHRAE 189.1-2010

Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?

A.

Select locally sourced and manufactured materials

B.

Procure materials directly from raw material suppliers

C.

Include all building materials in a whole-building life-cycle analysis

D.

Include the material requirements in the project specifications

What phase of the integrative process gives the team the greatest chance of success in meeting the project ' s environmental goals cost-effectively?

A.

Design

B.

Discovery

C.

Operations

D.

Construction

For IPp2: Human Impact Assessment, the team wants to use the ground-floor spaces to achieve both social equity and occupant experience. Which design features would achieve this dual objective?

A.

Designing public retail space as a café with seating in an adjacent plaza

B.

Locating the building 0.25 mi. (0.40 km) from a subway stop and providing secure bicycle storage

C.

Installing MERV-13 filters in all residential units and using low-VOC paint in the retail spaces

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

A.

At least two years prior to the date of project registration

B.

Within the past five years

C.

Within two years of the substantial completion of the project

D.

At least five years prior to the certification of the project

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

A.

Flooring

B.

Furniture

C.

Composite wood

D.

Wet applied products

What requirements are needed to earn Regional Priority credits?

A.

Full name and specialty credential of LEED AP

B.

Points are awarded automatically

C.

Exemplary performance

D.

Related credits registration

A contractor is building a retirement community project. 30% of the building ' s product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

A.

site conditions

B.

massing and orientation

C.

plug and process load needs

D.

building envelope performance

Which practice is recommended for protecting HVAC systems during construction to maintain indoor environmental quality and enhance occupant quality of life?

A.

Maintain extreme-heat protection

B.

Use low-emitting materials

C.

Install temporary air filters

A new facility has a comprehensive advanced energy metering system that measures energy consumption across multiple subsystems. The facilities manager aims to use this data to enhance energy management practices and improve overall building performance.

The facilities manager can utilize the advanced energy metering system to optimize energy use and reduce costs in the new student center by:

A.

Adjusting the setpoints of the HVAC system based solely on outdoor temperature changes

B.

Using automated alerts from the metering system to address sudden spikes in energy use

C.

Scheduling regular audits for all installed lighting systems to ensure compatibility with energy meters