Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED v5 AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 7
Total 454 questions

Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Alkalinity testing and ENERGY STAR® rating

B.

Non potable water sources and bacteria testing

C.

Water treatment calculations and system performance narrative

D.

Makeup water meters, conductivity controllers and overflow alarms

Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

A.

Burning fossil fuels

B.

Smoking tobacco products

C.

Preparing non-organic foods

D.

Manufacturing toxic chemicals

The LEED AP is leading the first design charrette for a new LEED project with the project ' s owners. What document should be used to record the project goals to be used throughout the design of the project?

A.

Owner ' s Project Requirements (OPR)

B.

Owner ' s list of wants and needs

C.

Criteria for contractor selection

D.

Basis of Design (BOD)

Which of the following is true regarding LEED Pilot Credits?

A.

Pilot Credits are not specific to the rating systems

B.

Pilot Credits can be attempted in the design review stage only

C.

A registered Pilot Credit must be replaced on the LEED project ' s scorecard if that pilot credit is removed from the Pilot Credit Library

D.

Pilot Credit feedback surveys must be completed

Operable windows contribute to resilient planning and design in extreme climate conditions by:

A.

Increasing the thermal mass of the building for heat retention

B.

Allowing natural ventilation to improve indoor air quality

C.

Facilitating seasonal thermal adaptation for occupants

In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?

A.

Temporary wood products cannot be included in the calculations

B.

If any temporary wood materials are included in the calculation, all wood materials must be included in the calculation

C.

Only Forest Stewardship Council (FSC)-certified wood materials are included in the calculation; non-certified wood materials contribute to other credits

D.

FSC-certified wood materials purchased for more than one project can be applied to other projects seeking LEED Certification

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary

B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary

C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary

D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary

Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?

A.

Document commissioning authority experience for at least one building project

B.

Review the owner ' s project requirements (OPR) for project goals and expectations

C.

Be a part of the project ' s design and construction management team

D.

Report results, findings, and recommendations directly to the architect

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

In addition to the vegetated terraces, the project team is considering installing a green roof with walkways, fountains, and seating areas for patients, visitors, and staff. If the project attempts SSc2: Accessible Outdoor Space, what percentage of the required outdoor space must be vegetated?

A.

20%

B.

25%

C.

30%

Which of the following methods is the referenced standard for demonstrating compliance with EQp2: Fundamental Air Quality?

A.

ASHRAE 55-2010

B.

ASHRAE Guideline 44

C.

ASHRAE 62.1-2022

D.

ASHRAE 90.1-2010

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

A.

50,000 ft2 (4 645 m2) office project

B.

80,000 ft2 (7 432 m2) hospital project

C.

110,000 ft2 (10 219 m2) school project

D.

140,000 ft2 (13 006 m2) retail project

A large residential building project is exploring strategies to reduce reliance on the municipal water supply. The design must ensure that reused water meets local health and safety standards and remains feasible within the project’s operating budget.

Which of the following considerations should the project team prioritize to effectively implement the water-reuse system while maximizing water efficiency?

A.

Install water meters to monitor the use of reclaimed water

B.

Conduct a feasibility study regarding the availability of alternative water sources on-site

C.

Assess the energy use of water-treatment technologies

Which of the following strategies supports energy resilience by enhancing the grid interactivity of a building?

A.

Install smart meters to provide real-time data on energy consumption

B.

Install energy-storage systems that can deploy energy during peak-demand periods

C.

Use occupancy sensors to turn lights on and off automatically

Which of the following strategies can be used to achieve a point in Innovation Credit, Innovation, Option 1.Innovation?

A.

Achieve 60% reduction in outdoor water use

B.

Implement an employee engagement and education plan

C.

Use on site renewable energy for 8% of the total energy needs

D.

Purchase green power for 100% of the total project energy use

IPp1: Climate Resilience Assessment identifies a high risk of extreme heat caused by the urban heat-island effect and flooding caused by an impervious site. Which combination identifies an appropriate strategy for heat and sea-level or flooding risks?

A.

Heat: High-albedo white roofSea level: Emergency backup generators

B.

Heat: High-efficiency variable refrigerant flow systemSea level: Green roof

C.

Heat: Exterior window shading and operable windowsSea level: Sump pumps with backup power

The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?

A.

Building-level energy metering

B.

Fundamental commissioning and verification

C.

Minimum energy performance

D.

Fundamental refrigerant management

Which of the following is a biofuel that is considered renewable energy under Energy and Atmosphere Credit, Renewable Energy Production?

A.

Combustion of municipal solid waste

B.

Non-mill residue forestry biomass waste

C.

Wood coated with paints, plastics, or resins

D.

Animal waste

Within EQp1: Construction Management, which practice should be included to promote a healthier and safer work environment within the project ' s construction management plan?

A.

Provide outdoor airflow measurement devices for all mechanical ventilation systems operated during construction

B.

After construction ends and before occupancy, but under ventilation conditions typical for occupancy, conduct baseline Indoor Air Quality (IAQ) testing

C.

Designate smoking areas at least 25 ft. (7.5 m) from the building

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Which LEED v5 rating system is appropriate for this project?

A.

LEED for New Construction and Major Renovations

B.

LEED for Commercial Interiors

C.

LEED for Healthcare

Which of the following products must always be included in Materials and Resources credits?

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system