LEED-AP-BD+C USGBC LEED AP Building Design + Construction (LEED v5 AP BD+C) Free Practice Exam Questions (2026 Updated)
Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED v5 AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.
Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?
The LEED AP is leading the first design charrette for a new LEED project with the project ' s owners. What document should be used to record the project goals to be used throughout the design of the project?
Which of the following is true regarding LEED Pilot Credits?
Operable windows contribute to resilient planning and design in extreme climate conditions by:
In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?
When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?
Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?
A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.
The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.
The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.
The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.
The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.
The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.
The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.
In addition to the vegetated terraces, the project team is considering installing a green roof with walkways, fountains, and seating areas for patients, visitors, and staff. If the project attempts SSc2: Accessible Outdoor Space, what percentage of the required outdoor space must be vegetated?
Which of the following methods is the referenced standard for demonstrating compliance with EQp2: Fundamental Air Quality?
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
A large residential building project is exploring strategies to reduce reliance on the municipal water supply. The design must ensure that reused water meets local health and safety standards and remains feasible within the project’s operating budget.
Which of the following considerations should the project team prioritize to effectively implement the water-reuse system while maximizing water efficiency?
Which of the following strategies supports energy resilience by enhancing the grid interactivity of a building?
Which of the following strategies can be used to achieve a point in Innovation Credit, Innovation, Option 1.Innovation?
IPp1: Climate Resilience Assessment identifies a high risk of extreme heat caused by the urban heat-island effect and flooding caused by an impervious site. Which combination identifies an appropriate strategy for heat and sea-level or flooding risks?
The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?
Which of the following is a biofuel that is considered renewable energy under Energy and Atmosphere Credit, Renewable Energy Production?
Within EQp1: Construction Management, which practice should be included to promote a healthier and safer work environment within the project ' s construction management plan?
A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.
The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.
The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.
The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.
The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.
The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.
The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.
Which LEED v5 rating system is appropriate for this project?
Which of the following products must always be included in Materials and Resources credits?