LEED-AP-BD+C USGBC LEED AP Building Design + Construction (LEED AP BD+C) Free Practice Exam Questions (2025 Updated)
Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
What are the requirements of commercial projects for long-term bicycle storage under Location and
Transportation, Bicycle Facilities - Bicycle Storage and Shower Rooms?
During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?
When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?
Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?
The Solar Reflectance Index (SRI) includes the measure of a material's
Which of the following products must always be included in Materials and Resources credits?
Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?
A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?
What information must be provided to demonstrate compliance with the Owner’s Project Requirements (OPR)?
Minimizing light trespass is a key component of which of the following credits?
Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?
Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Qualifying spaces for the Sustainable Sites Credit, Places of Respite must
What is a benefit of including the public in a charrette for a new school before the pre-design phase?
Which of the following buildings meets the Minimum Program Requirements for LEED certification?
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:
A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?
Under the Energy and Atmosphere Credit, Optimize Energy Performance, what method should display lighting use for establishing allowable lighting power?
A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?