Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: stp75

Easiest Solution 2 Pass Your Certification Exams

LEED-Green-Associate USGBC LEED Green Associate GAFRE Exam (LEED GA) Free Practice Exam Questions (2026 Updated)

Prepare effectively for your USGBC LEED-Green-Associate LEED Green Associate GAFRE Exam (LEED GA) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 4 / 7
Total 430 questions

Which aspect of LEED certification allows it to be applicable to both small and large projects?

A.

Holistic approach to sustainability

B.

Standardized scoring system across different project types

C.

Requirement to follow identical credit categories for all projects

D.

Requirement that all projects earn the same credits

Installing permanent water submeters that measure the total potable water use for a building and associated grounds has which of the following benefits?

A.

Informs the selection of locally adapted plants

B.

Allows facility staff to track water consumption and identify leaks

C.

Increases on-site water retention and infiltration of rainfall into the ground

D.

Reduces the amount of water needed to support industrial and process systems

A project team is pursuing LEED certification for an existing commercial office building to certify ongoing sustainability performance. Which LEED rating system should be used for this project?

A.

LEED for Neighborhood Development

B.

LEED for Building Design and Construction

C.

LEED for Interior Design and Construction

D.

LEED for Building Operations and Maintenance

Which of the following will help projects develop pedestrian-oriented open spaces for building occupants?

A.

Providing street trees, shade, and benches

B.

Implementing a rainwater and pollution control plan

C.

Developing a landscape plan with a certified arborist only

D.

Clearing and grubbing the entire site

What rating system should a project use if 55% of the project ' s gross floor area is appropriate to certify under LEED BD+C and 45% is appropriate under LEED O+M?

A.

Project team must decide which rating system is most applicable

B.

LEED Green Associate must decide

C.

LEED BD+C

D.

LEED O+M

The intent of the location valuation factor is to incentivize the purchase of products that

A.

reduce transportation emissions

B.

support the local economy and workers

C.

emit no Volatile Organic Compounds (VOCs)

D.

comply With responsible extraction regulations

Flush out process is performed to remove which of the following?

A.

voc

B.

Waste

C.

Graywater

D.

Blackwater

Volatile organic compounds (VOCs) negatively impact which of the following entities?

A.

Quality of daylight

B.

Quality of indoor air

C.

Durability of a product

D.

Ability to recycle a product

Which of the following must a waste reduction, reuse and recycling program collect and measure?

A.

Excavated soil and land-clearing debris

B.

Hazardous materials leaving the building

C.

Recycled content 0t purchased office supplies

D.

Waste diverted through recycling and reuse

A tile manufacturer produces tiles that are made from fully recyclable materials and are designed for easy disassembly and possible recycling at the end of their life. Which of the following life cycle assessment approaches does this manufacturer use?

A.

Cradle to cradle

B.

Cradle to site

C.

Cradle to grave

D.

Cradle to gate

Which of the following water types is suitable for drinking?

A.

Graywater

B.

Greenwater

C.

Stormwater

D.

Potable water

Which of the following strategies can contribute to optimal thermal comfort for building occupants?

A.

Scheduling regular HVAC system maintenance

B.

Installing ceiling fans only in common areas

C.

Utilizing large open spaces for air circulation only

D.

Removing individual thermal comfort controls

Which of the following standards addresses guidance for sustainable construction in complying with building codes?

A.

ASHRAE 72

B.

ASHRAE 62.1

C.

ASHRAE 90.1

D.

ASHRAE 189.1

Which of the following strategies meets energy demand with renewable energy?

A.

Installing a solar hot water heater

B.

Incinerating waste to heat a home

C.

Implementing a composting program in an office break room

D.

Purchasing Renewable Energy Certificates (RECs)from a clean coal plant

At which stage should the coordination of building and site systems be addressed to maximize the impact of integrative process?

A.

Predesign

B.

Detailed Design

C.

Post Occupancy

D.

Schematic Design

A commercial office building project is pursuing LEED certification. The project team is focused on reducing environmental impact while enhancing occupant well-being. They are considering strategies including energy efficiency improvements, water conservation measures, and the use of eco-friendly materials. The building is situated in an urban area with access to public transportation, aiming to reduce the need for personal vehicles. Which of the following LEED credit categories would support healthy people and ecosystems?

A.

Energy and Atmosphere (EA)

B.

Water Efficiency (WE)

C.

Indoor Environmental Quality (EQ)

D.

Materials and Resources (MR)

Which of the following strategies should a construction company implement to maximize waste diversion and support a circular economy?

A.

Developing a comprehensive waste management plan

B.

Increasing the number of dumpsters on-site for general waste

C.

Minimizing the use of recyclable materials to reduce potential waste

D.

Sending mixed construction waste directly to landfill

In which of the following common building applications are chlorofluorocarbons (CFCs) found?

A.

Fire hydrants

B.

Roof-top vents

C.

Insulation agents

D.

Centrifugal chillers

Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?

A.

Onsite renewable systems

B.

Enhanced Commissioning (Cx)

C.

Measuring and verifying systems performance for one year

D.

Applying an integrative design process

A project team is pursuing certification of recently remodeled tenant space. Which of the LEED rating systems apply?

A.

LEED Interior Design and Construction: Commercial Interiors

B.

LEED for Building Operations and Maintenance: Existing Buildings

C.

LEED Building Design and Construction for Core and Shell

D.

LEED Building Design and Construction for New Construction

Page: 4 / 7
Total 430 questions
Copyright © 2014-2026 Solution2Pass. All Rights Reserved