Prepare effectively for your USGBC LEED-Green-Associate LEED Green Associate Exam (LEED GA) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 5
Total 320 questions

Which of the following Is a strategy for improving Indoor Environmental Quality during construction?

A.

Cover duct work with plastic

B.

Store absorptive-finish materials directly on slab

C.

Collect construction debris in the mechanical room

D.

Run permanently installed HVAC with final filtration media

A building is located on a site without access to public transportation. Which of the following strategies can a project team implement in order to reduce the environmental impacts associated with how the occupants get to and from the building?

A.

Limit parking

B.

Provide incentives for carpooling

C.

Build underground parking structure

D.

Use compact development strategies

Which of the following does LEED promote by encouraging compact development?

A.

Urban sprawl

B.

Walkability

C.

Historic preservation

D.

Development of new infrastructure

Which of the following credit categories does not have a prerequisite?

A.

Water Efficiency

B.

Materials and Resources

C.

Location and Transportation

D.

Indoor Environmental Quality

Light colored paving and cool roofs are terms referring to materials with

A.

lower emissivity and lower albedo

B.

lower emissivity and higher albedo

C.

higher emissivity and lower albedo

D.

higher emissivity and higher albedo

An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?

A.

LEED AP

B.

Leasing Agent

C.

Facilities Manager

D.

Commissioning (Cx) Agent

Which of the following is a type of quality transit in LEED?

A.

Taxi

B.

Bicycle

C.

Motorcycle

D.

Single passenger car

Disposal of solid waste generated from building construction and operations has a substantial effect on which greenhouse gas emission?

A.

Methane produced from landfill decay

B.

Hydrochloric acid produced from incineration

C.

Carbon monoxide produced from incineration

D.

Volatile organic compounds (VOCs) produced from landfill decay

Use of which of the following can help reduce the heat gain and peak air temperatures?

A.

A drip irrigation system

B.

Pervious paving materials

C.

Low albedo paving materials

D.

High reflectance roofing materials

A building owner is considering developing an undeveloped urban site. What characteristic of the location is most relevant to LEED?

A.

Access to quality transit

B.

Proximity to renewable energy array

C.

Proximity of the site to a landfill

D.

Location of a local U.S. Green Building council (USGBC) office

Which of the following factors contributes to improved general health of building occupants and construction workers?

A.

High VOC building materials

B.

Post-occupancy flush outs

C.

Application of construction management practices

D.

Low ventilation rates

LEED certification steps generally proceed in which of the following order?

A.

Project Registration, Application Preparation, Submission, Application Review, Certification

B.

Application Preparation, Application Review, Project Registration, Submission, Certification

C.

Select LEED rating system, Submission, Application Review, Project Registration, Certification

D.

Application Preparation, Project Registration, Application Review, Submission, Certification

Which of the following tools should be used to identify indoor environmental issues and prepare a corrective action plan to make necessary changes?

A.

Thermal sensors

B.

Occupant surveys

C.

Life-cycle assessments

D.

Mixed-mode design calculations

In addition to prohibiting smoking inside buildings, it is also important to prohibit smoking near:

A.

Covered parking spaces

B.

Landscaped areas

C.

Air exhausts

D.

Building entrances

During the charrette, the project team is discussing strategies for improving the indoor environmental quality Which strategy will help attain points toward certification?

A.

Daylighting

B.

Night lighting

C.

Installing indoor plants

D.

Installing inoperable windows

Building and material reuse contribute to the sustainability goals of a project by

A.

reducing the use Of raw materials

B.

saving time during the material selection phase

C.

lowering the overall construction budget ot the project

D.

utilizing waste-to-energy as an alternative to fossil fuel extraction

Which of the following strategies meets energy demand with renewable energy?

A.

Installing a solar hot water heater

B.

Incinerating waste to heat a home

C.

Implementing a composting program in an office break room

D.

Purchasing Renewable Energy Certificates (RECs)from a clean coal plant

What is considered as the receptacle load?

A.

The electrical current drawn by regulated and non-regulated receptacles

B.

The electrical current drawn by the individual receptacle connected to a standby battery

C.

The electrical current Which is non-regulated and has major impact on the load 0t the overall network

D.

The electrical current drawn by all equipment that is connected to the electrical system via a wall outlet

Volatile organic compounds (VOCs) negatively impact which of the following entities?

A.

Quality of daylight

B.

Quality of indoor air

C.

Durability of a product

D.

Ability to recycle a product

During which stage of the conventional building process are each disciplined practitioner on project teams involved?

A.

Discovery phase

B.

post occupancy phase

C.

End of project discovery phase

D.

As required during design process