Prepare effectively for your USGBC LEED-Green-Associate LEED Green Associate GAFRE Exam (LEED GA) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 6
Total 360 questions

The purpose of a life-cycle assessment in LEED is to evaluate the potential:

A.

Environmental impacts of a building through its life-cycle

B.

Cost impacts of a building through its life-cycle

C.

Safety impacts of a material through its life-cycle

D.

Human impacts of a material through its life-cycle

Which of the following sites is most appropriate to encourage a walkable street design?

A.

A neighborhood that includes a diversity of use

B.

An area with a decreased building-height-to-street-width ratio

C.

A development that uses many culs-de-sac in the street design

D.

A project in an area designed with streets to facilitate increased speed limits

Which of the following narratives explains the relationship between prerequisites and credits for purposes of LEED certification?

A.

Not all credit categories have a prerequisite

B.

Prerequisites are mandatory and credits are optional

C.

Prerequisites are mandatory if credits are pursued in the specific category

D.

Credits are assigned the same base points and prerequisites are weighted

Which of the following strategies meets energy demand with renewable energy?

A.

Installing a solar hot water heater

B.

Incinerating waste to heat a home

C.

Implementing a composting program in an office break room

D.

Purchasing Renewable Energy Certificates (RECs)from a clean coal plant

Which impact categories have been identified as most important for a LEED project to accomplish?

A.

Increase return on investment, promote human scale development

B.

Protect biodiversity and ecosystem services, improve business efficiency

C.

Reduce contribution to climate change, enhance human health and well-being

D.

Increase return on investment, promote sustainable and regenerative material cycles

Which of the following products would meet the Green Seal standards?

A.

Desks and cabinets

B.

Carpet and carpet pads

C.

Windows and window frames

D.

Custodial products and materials

In the context of a LEED project, the charrette is a

A.

set of preliminary design specifications submitted by project team members

B.

forum at which the final schematic of the project is presented to the community

C.

procedure through which experts are selected to participate on the project team

D.

meeting of stakeholders, project team members and others to establish project objectives

Which of the following terms encourages team members to collaborate throughout the process of design and construction to create synergistic solutions?

A.

Charrette

B.

Triple bottom line

C.

Life-cycle analysis

D.

Integrative design

What does the U.S. Green Building Council (USGBC) administer?

A.

LEED Green Associate exams

B.

LEED rating systems development

C.

LEED Credentialing programs related to Green Building practice

D.

LEED Project Certification through third-party certification bodies accredited by the American National Standards Institute (ANSI)

The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?

A.

A brownfield site with no access to metro

B.

A brownfield site in a national park with car access only

C.

A greenfield site with access to public transport and proximity to grocery stores

D.

A brownfield site with access to five lines of public transportation and basic services

A new tenant in an existing office building is pursuing LEED certification. The tenant would like to encourage alternative transportation methods. Which of the following items can be used to satisfy this request and achieve LEED Location and Transportation Credit?

A.

Provide underground parking

B.

Designate preferred parking for motorcycles

C.

Develop on a brownfield site after remediation

D.

Develop an alternative commuting incentive program

Which of the following power sources are considered green power?

A.

Natural gas

B.

Biomass

C.

Nu clear

D.

Clean coal

Which of the following is a minimum program requirement for LEED@ for New Construction and Major Renovations projects?

A.

Be a permanent building or space on existing land

B.

Commit to sharing data for water usage only

C.

Comply with maximum floor area requirements

D.

Comply with maximum ventilation rate requirements

Which ASHRAE standard defines thermal comfort for building occupants?

A.

ASHRAE 55

B.

ASHRAE 189.1

C.

ASHRAE 62.1

D.

ASHRAE 90.1

A firm has been hired to renovate an existing office building and wants to increase the number of points the project receives for Location and Transportation credits. What strategy might the firm recommend?

A.

Shade the large open parking area with a solar-paneled canopy

B.

Include subsidies for carpools

C.

Replace traditional paving on the parking lot with pervious surfacing

D.

Reduce the building's footprint on the site

What element of design can be used to take advantage of natural ventilation, solar energy and daylight?

A.

Cool roof

B.

Facade treatment

C.

Building orientation

D.

LOW visible transmittance glazing

Which Is a component of a construction waste management plan?

A.

List of materials to be diverted from disposal

B.

Projected cost savings from diverting waste

C.

Quantity of waste generated from excavated soil

D.

Distance of the recycling facility from the project site

How is an exemplary performance point earned if the credit is available for exemplary performance per the Reference Guide?

A.

Submit a Project CIR

B.

Increase performance by 25%

C.

Verify that precedent has been established

D.

Meet the indicated incremental performance threshold

The cost of Commissioning (Cx) Is often repaid with

A.

advanced energy metering

B.

renewable power management

C.

recovered energy performance

D.

enhanced refrigerant management

During which stage of the conventional building process are each disciplined practitioner on project teams involved?

A.

Discovery phase

B.

post occupancy phase

C.

End of project discovery phase

D.

As required during design process

Page: 3 / 6
Total 360 questions