Prepare effectively for your Huawei H12-322 Huawei Certified ICT Professional - Wireless Local Area Network- Planning and Optimizing Enterprise WLAN certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 5 / 5
Total 282 questions

What is the correct WLAN network planning process?

A.

Demand Collection -> Pre-sales Net Gauge -> Customer Exchange Quotation -> Detailed Survey -> After-sales Net Gauge

B.

Demand Collection -> Pre-sales network rules -> Detailed engineering survey -> After-sales network rules

C.

Demand Collection -> Customer Exchange Quote -> Detailed Survey -> After-sales Net Gauge

D.

Demand collection -> Pre-sales network rules -> Customer exchange quotes

The following is not the design of the rail transit redundancy business?

A.

Car wireless link redundancy

B.

CBTC deployment dual wireless network

C.

PIS car communication double network

D.

Using the 802.11n protocol

In HT40 mode, the primary channel sends beacon packets and some data packets, and the secondary channel sends other packets.

A.

True

B.

False

The following is a preliminary description of the preliminary planning before the survey?

A.

For indoor coverage scenarios, preliminary planning of the number and location of APs can be based on customer needs and drawings.

B.

When planning the initial planning, pay attention to the unclear part of the information, mark it, and pay attention to the site survey.

C.

Preliminary planning of the outdoor bridge, you can use Google Earth to mark the location and bridge path to initially evaluate the feasibility.

D.

Preliminary planning of outdoor bridges, focusing on the distance between stations, altitude occlusion, etc.