Prepare effectively for your Huawei H19-371_V1.0 HCS-Pre-sales-Digital Power V1.0 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 7
Total 653 questions

The management software recommends that the optimal location of the server installation is not considered ( ).

A.

Cabinet load

B.

Cabinet Capacity

C.

Network Bandwidth

D.

Electrical load capacity

NETECO Which are the basic functions of the software and do not require separate and customer quotations ( ).

A.

GIS maps

B.

Battery Management

C.

Energy Efficiency Management

D.

Work Order Management

A system is configured with 15min battery backup time, and the discharge termination voltage of the battery cell should be selected ( ). /

A.

1.75V

B.

1.80V

C.

1.67V

D .1.60V

Configure the UPS system scheme, which of the following factors need to be considered in the calculation scheme ( )

A.

UPS type, capacity and parallel mode

B.

The brand and capacity of the battery

C.

Make and model of AC and DC cables

D.

Configuration of battery rack and battery switch box

Which of the following measures does the NetEco management system take to ensure the security of the software platform and prevent the leakage of sensitive business data?

A.

The transmission channel between the management system and the collector adopts encrypted transmission mode

B.

The management system passes the security scan of anti-virus software

C.

Security reinforcement and vulnerability prevention for operating systems, databases, and management systems

D.

User password is encrypted

The NetCol5000-A042H full-cabinet row-level air-cooled variable frequency precision air conditioner supports a cooling capacity adjustment range of ( ), which can continuously cool under low load in the afternoon and avoid temperature

and humidity fluctuations and unit reliability problems caused by frequent start and stop.

A.

10~100

B.

15~100

C.

20~100

D.

25~100

What is the seismic rating of the IT cabinet of FusionModule2000?

A.

8

B.

9

C.

7

UPS000-A/E 400KVA and above models are divided into standard version and enhanced version, of which the standard version comes standard with ( ) isolating switch

A.

Main input

B.

Bypass Input

C.

Maintenance

D.

output

The NetEco6000 management system can provide the temperature cloud map function to realize the identification of cold and hot spots in the computer room. How many layers does the temperature cloud map support?

A.

Single layer

B.

Double layer

C.

Three floors

D.

Fourth floor

What are the incoming line methods supported by UPS5000-A-400/500K? ( )

A.

Downstream

B.

Top entry line

C.

Compatible with upper and lower incoming lines

What is the total IT load power of the FusionModule1000A V2R3 version 40-foot IT solution?

A.

52kW

B.

55kW

C.

70kW

D.

72kW

The wrong description about the reliability of NetCol5000-C row-level air conditioner is:

A.

It adopts dual power supply, and the two power supply adopts automatic switching mode

B.

Operators, large data centers such as large corporate headquarters prefer this type of air conditioner, and small and medium-sized enterprises are more likely to use NetCol5000-A air conditioners

C.

Multi-fan air supply: online maintenance is possible

D.

Cannot be used in scenarios without raised floor, because condensate drainage cannot be connected to the pipe

Eaton and UPS5000-A 30kVA~120kVA similar models are ().

A.

9395

B.

NXR

C.

9390

The capacity management module of the NetEco management system can manage the resource capacity information in the computer room. Which of the following capacity elements is under the management of NetEco?

A.

Network port

B.

Network Bandwidth

C.

CPU utilization

D.

None of the above is supported

When a system is configured with 1H battery backup time, the discharge termination voltage of the battery cell should be selected as ( ).

A.

1.60V

B.

1.67V

C.

1.75V

D.

1.80V

The fire-fighting measures that can be used in the Class A computer room include:

A.

Gas Fire Extinguishing System

B.

Water mist fire extinguishing system

C.

Automatic sprinkler system

D.

All of the above

What function of NETECO needs to be used ( ) if the customer wants to know the status of the equipment on and off the shelf and the capacity of the cabinet.

A.

Work Order Management

B.

Energy Efficiency Management

C.

Asset Management

D.

Capacity Management

The output power factor of UPS2000-G-(6K-20K) is ( ), which is suitable for new IT loads and significantly improves the load capacity of the system.

A.

0.7

B.

0.8

C.

C. 0.9

D.

0.99

2GUPSS000-E (50kVA power module) 150kVA, rack 1+1 redundancy, total input power distribution cabinet, the required total input switch is ( ). /

A.

250A

B.

320A

C.

500A

D.

630A

The UPS5000-E has the function of adjusting the number of battery cells, which avoids the failure of a single battery to cause the replacement of the entire group, and solves the problem of difficult maintenance of

traditional UPS batteries. May I ask how many cells can be adjusted in the UPS5000-E (50kVA module)? ()

A.

30-40

B.

32-40

C.

32-42

D.

30-44

The type of UPS5000-E is ( ). /

A.

Power frequency machine

B.

High Frequency Modularity

C.

High frequency tower

When the Netfco management system adopts the single 6RH1585 server, it can support the maximum access (10,000 test points, so as to realize the centralized management of multiple data centers?

A.

20

B.

40

C.

50

D.

100

UPS5000-E can easily realize N+X power supply system by only selecting ( ) , and the operation is simple and convenient. .

A.

BSC cable

B.

Parallel cable

C.

BSC Control Board

D.

Parallel card

FusionModule2000 v3.0 version intelligent module status indication eLight function description is correct? (

A.

The door frame indicator eLight is only a decorative atmosphere rendering function

B.

The door frame indicator can be associated with the alarm status

C.

The door frame indicator eLight is the module lighting function

D.

None of the above is true

What are the incoming line methods supported by UPS5000-A-400/500K? ( )

A.

Downstream

B.

Top entry line

C.

Compatible with upper and lower incoming lines

The total current of the battery pack is 1000A, and it is equipped with 3 sets of batteries. The most economical configuration of the cable from the main switch box to the sub-switch box is ( )

A.

95mm 2 (328A) X2

B.

120mm 2 (382A) X2

C.

150mm 2 (441A) X2

D.

185mm' 2 (506A) X1

UPS5000-E only needs to select ( ), it can easily realize 2N power supply system, and the operation is simple and convenient. .

A.

BSC cable

B.

Sync Controller

C.

BSC Control Board

D.

Parallel card

UPS5000-E comes standard with an LCD display, supports multiple languages, can display the system running status in real time, and can store up to ( ) alarm records

A.

2000

B.

2500

C.

3000

Which model is the row-level air conditioner of Fusionmodule2000? ( )

A.

PDU8000

B.

UPS5000

C.

NetCo15000

D.

ECC800

UPS5000-E 100kVA, the input switch to be selected by the machine, which of the following is the most suitable (.

A.

125A

B.

80A

C.

160A

D.

200A