New Year Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

H19-619_V1.0 Huawei HCSP-Presales-Government Public Services V1.0 Free Practice Exam Questions (2025 Updated)

Prepare effectively for your Huawei H19-619_V1.0 HCSP-Presales-Government Public Services V1.0 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 7
Total 410 questions

Urban operation monitoring and early warning can achieve a closed loop from problem discovery to supervision and promote standardization and pilot demonstration.

A.

True

B.

False

“One-Network Collaboration (一网通协)” mainly revolves around which type of business?

A.

Livelihood digitalization

B.

Government (administrative) digitalization

C.

City digitalization

D.

Industry digitalization

In the “seconds-level approval and handling” system, theauto-signingfunction integrates with the region’s existing e-signature system to automatically sign commitment letters and application materials, building a new intelligent approval responsibility mechanism.

A.

True

B.

False

Government Connect (务通), based on a unified portal framework, provides integrated messaging, to-do scheduling, and address book management.

A.

True

B.

False

Why do we need to build acomprehensive data-governance system?

A.

To ensure operators have standardized processes and guidance

B.

To ensure sufficient保障for the required talent, organization, and budget in governance

C.

To provide an arbitration body and escalation mechanism when disputes arise

D.

To ensure that key data assets have clear business management responsibilities

E.

To provide stable principles and basis for IT construction

Government departments often have diverse, long-tail AI needs, multiple AI vendors, and siloed systems without unified planning. It is recommended to build a unified computing resource pool and AI platform, with multi-tenant capability for secure isolation.

A.

True

B.

False

TheGuiding Opinions of the State Council on Strengthening the Construction of Digital Governmentmainly promotes the sustainable and healthy development of digital government through process-based assessments.

A.

True

B.

False

Which of the following arecommon event-reporting channels?

A.

District urban-management, comprehensive-governance and other business systems

B.

Mayor’s mailbox, Xinhua web and other official websites

C.

Weibo, WeChat official accounts and other media channels

D.

Hotlines such as 12345, 12319, 12315

Smart water conservancy is built under the principle of “demand-driven, application-first, digital empowerment, capacity提升”, accelerating construction of a “Four-Pre” system with forecasting, early warning, rehearsal and “pre-collection (预采)”.

A.

True

B.

Flase

The “Warm Reminder Service” system transforms the old pattern of “people look for services” into “services look for people,” effectively improving satisfaction for enterprises and citizens.

A.

True

B.

False

The six major components of digital-government construction include which of the following?

A.

Government services

B.

City operation management

C.

Government office

D.

Digital-city integrated perception

E.

Digital-city intelligent hub

F.

Government big-data system construction

Which of the following are behaviors/functions of aCity Vital-Signs application?

A.

Report generation

B.

Vital-sign configuration

C.

Indicator early warning

D.

Alarm forwarding

Overall understanding ofOne-Network Collaboration (一网通)includes which aspects?

A.

Overall architecture: perception layer, connection layer, platform layer, application layer

B.

Business scenarios: Government Connect (政务通), trusted office, administrative meetings

C.

Business positioning: build “five-cross” collaboration (cross-level, cross-region, cross-system, cross-department, cross-business) to improve internal government efficiency

D.

Business goals: build a convenient (anytime, anywhere), secure (protecting government assets), and efficient (improving meeting efficiency) government collaboration system

To integrate video monitoring resources from multiple agencies, Huawei builds the video networking platform through which interface method?

A.

IVS Video Networking

B.

Private-protocol integration

C.

NVR video surveillance

D.

SDK integration

Which of the following are included in Huawei’soverall data-governance blueprintconstruction?

A.

Developing “manage data” processes

B.

Implementing data-quality management mechanisms

C.

Designing a unified and complete information architecture

D.

Improving the company’s data-management organization

E.

Formulating data-management policies and guidelines

Huawei fully participates in informatization construction for the Ministry of Emergency Management, including the ministry itself, fire / forest fire, earthquakes, hazardous chemicals, coal mine supervision, etc., and takes part in top-level design, strategic cooperation, and standards development.

A.

True

B.

False

“One-Network Collaboration (一网通协)” mainly focuses on:

A.

Government (administrative) digitalization

B.

City digitalization

C.

Livelihood (people’s livelihood) digitalization

D.

Industry digitalization

What is the mainstream technology route for new-generation PC chips?

A.

x86 architecture

B.

ARM architecture

C.

MIPS architecture

For a digital-twin–basedCity Traffic Management Brain, which key capabilities enhance city traffic management and travel services?

A.

Congestion-scenario simulation algorithms and active-control methods, including ramp control, variable dynamic speed limits, dynamic dedicated lanes for passenger/freight, dynamic emergency-lane control, and diversion

B.

Precise traffic-situation forecast models triggered by events; road-impact analysis algorithms to compute affected vehicles–road segments–lanes

C.

Computable road-network models that support capacity calculation, segment capacity evaluation, lane-level simulation, local micro traffic modeling, hotspot-area modeling, and lane-level network simulation

D.

Simulation and verification of traffic strategies, assessing the effect of active-control strategies, with simulation/prediction accuracy above 95%

E.

LDM building a holographic road network, with one perception/control network supporting all service applications (toll/monitoring, V2X integration)

Video conferencing can maintain video quality even with a 50% packet-loss rate.

A.

True

B.

False

Page: 3 / 7
Total 410 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved