Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: stp75

Easiest Solution 2 Pass Your Certification Exams

LEED-Green-Associate USGBC LEED Green Associate GAFRE Exam (LEED GA) Free Practice Exam Questions (2026 Updated)

Prepare effectively for your USGBC LEED-Green-Associate LEED Green Associate GAFRE Exam (LEED GA) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 7
Total 430 questions

Which of the following scenarios would potentially help a project earn the most LEED points?

A.

Renovate an abandoned shopping mall in a low-density area outside the city

B.

Build an office and apartment building near an interstate highway and an existing shopping mall

C.

Renovate a large building in a diverse, walkable business district and central transit connectivity

D.

Build a low-density project on a greenfield site outside the city in order to mitigate environmental impact

The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to

A.

burn paper and cardboard materials on-site

B.

use contractor vehicles to disperse waste materials to multiple disposal sites within the project region

C.

follow requirements for using dimensional construction materials, prefabrication or material efficient framing

D.

take advantage of municipal waste pick-up to reduce the weight of the project ' s construction material scraps

Which of the following standard organizations support requirements for the Minimum Energy Performance Prerequisite and the Minimum Indoor Air Quality Performance Prerequisite?

A.

SMACNA

B.

International Code Council

C.

ASHRAE

D.

ENERGY STAR

To meet requirements under the LEED Energy and Atmosphere category the project team needs to evaluate the performance of a commercial office building system relative to a baseline equivalent to minimal compliance with an applicable energy code What is the baseline standard to make this evaluation?

A.

ASHRAE 90 1-2010

B.

ASHRAF 6?

C.

ENERGY STAR '

D.

SMACNA

What are the three impact areas that LEED encourages positive action in?

A.

Environmental justice, climate resilience, and biodiversity protection

B.

Decarbonization, quality of life, and ecological conservation and restoration

C.

Climate adaptation, social equity, and sustainable materials

D.

Energy savings, water savings, and recycling only

A developer has asked the building designer to incorporate a landscape irrigation system using the building ' s graywater in order to earn LEED points. Which is the most appropriate source of graywater for this use?

A.

Urinal

B.

Toilet

C.

Janitor sink

D.

Bathroom sink

Which of the following is an appropriate usage of U.S. Green Building Council (USGBC) terminology for a LEED project?

A.

LEED certified building

B.

LEED ' s certified building

C.

LEED Accredited Building

D.

LEED Registered, Gold Building

The Solar Reflective Index (SRI) applies to which concept?

A.

Reducing light pollution

B.

Reducing heat island effect

C.

Avoidance of sensitive habitat

D.

Maximizing access to open space

Which of the following is a component of the Promote Sustainable and Regenerative Material Resource Cycles impact category?

A.

Move to Cyclical, Non-Depleting Material Cycles

B.

Protect Human Health Globally and Across the Built Environment Life Cycle

C.

Protection and Restoration of Water Regimes and Natural Hydrological Cycles

D.

Greenhouse Gas (GHG) Emissions Reduction from the Embodied Energy of Materials

When considering water conservation and water efficient landscaping, which type of water would be most useful for landscape irrigation?

A.

Rainwater

B.

Blackwater

C.

Clean water

D.

potable water

The intent of waste management in the Materials and Resources credit category is to

A.

specify the use of green materials

B.

promote the use of rapidly renewable resources

C.

reduce the amount of waste and toxins hauled to landfills

D.

increase the use of pre-consumer/post-consumer recycled content

LEED Online can be used

A.

to register for the LEED AP exam

B.

by the public to look at projects used for case studies

C.

to purchase reference guides

D.

to monitor the entire project certification process

When selecting the appropriate LEED rating system for a project, which of the following processes should the project team use if the project falls under multiple rating systems?

A.

Refer to LEED’s Minimum Program Requirements for a final decision

B.

Perform a comprehensive environmental impact study

C.

Use the Rating System Selection Guidance

D.

Select the rating system with the fewest prerequisites

When the same team members are involved more than once in an integrated approach, it leads to

A.

a decline in systems thinking

B.

users getting better at the process

C.

getting more LEED points

D.

a lack of new ideas

When redesigning wall assemblies to meet energy code requirements while improving noise control, which strategy effectively supports both objectives?

A.

Installing single-glazed windows

B.

Using staggered studs

C.

Utilizing insulation with a high U-value

D.

Removing insulation from wall cavities

In order to maintain the LEED Green Associate credential, you must earn which of the following continuing education credits?

A.

15 hours per year with six hours being LEED specific

B.

15 hours every two years with three hours being LEED specific

C.

30 hours per year with three hours being LEED specific

D.

30 hours every two years with six hours being LEED specific

The Increase in air temperature in a developed area resulting from the dark surfaces of roadways, parking lots, and tarred rooftops is known as

A.

emissivity

B.

global warming

C.

greenhouse gas

D.

heat island effect

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

A.

OPR, Design, Construction, Operations and Maintenance

B.

Basis of Design (BOD), OPR, Cx, Construction

C.

Pre-Design, Design, Construction, Occupancy and Operations

D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)

Which of the following is a source of graywater?

A.

Toilets

B.

Urinals

C.

Sprinklers

D.

Lavatory faucets

Which of the following strategies will help to improve indoor air quality during construction?

A.

Locate air intakes in the building loading dock area

B.

Designate a smoking room in the building

C.

Select low Volatile Organic Compound (VOC) paints, adhesives. sealants and furniture

D.

Reduce outdoor air flow

Page: 2 / 7
Total 430 questions
Copyright © 2014-2026 Solution2Pass. All Rights Reserved