Prepare effectively for your USGBC LEED-Green-Associate LEED Green Associate GAFRE Exam (LEED GA) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 6
Total 360 questions

Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?

A.

Positive feedback loop

B.

Negative feedback loop

C.

Building commissioning

D.

Building retrocommissioning

Which of the following options is a source of Scope 1 greenhouse gas emissions?

A.

On-site landfills

B.

Business travel

C.

Purchased electricity

D.

Employee commuting

Where could a project be located to purchase Renewable Energy Certificates (RECs)?

A.

Almost anywhere

B.

Where utilities are deregulated

C.

Only with cooperating local utilities or power markets

D.

Near hydroelectric dams, wind farms or other sources of renewable energy

The installation of impervious surfaces, such as asphalt and concrete, results in

A.

increased percolation and infiltration of water

B.

reduced outdoor water use

C.

reduced heat island effect

D.

increased water runoff

When should the Commissioning Authority (CxA) be brought onto the project team?

A.

At the end of Design Development (DD)

B.

Early in the Schematic Design (SD) phase

C.

Once Construction Administration (CA) begins

D.

Early in the Post-Occupancy Evaluation (POE)

Which of the following strategies are used to address Transportation in Operation and Maintenance under the Location and Transportation LEED Category?

A.

Use xeriscaping

B.

Offer financial incentives

C.

Minimize impervious areas

D.

Size the building appropriately

Integrated Project Planning and Design is a prerequisite for which type of buildings?

A.

Retail

B.

Schools

C.

Healthcare

D.

Data Centers

Who is the most responsible for monitoring ongoing energy performance over the life of the building?

A.

LEED AP

B.

Contractor

C.

Facility Manager

D.

Commissioning (Cx) Agent

Which location for a new building will have the greatest impact on lowering greenhouse gas emissions?

A.

An economic development district

B.

A brownfield location

C.

A previously developed site

D.

An urban center instead of the suburbs

Which of the following facilitates the recharging of aquifers?

A.

Asphalt road

B.

Pervious paving

C.

Impervious paving

D.

Concrete parking lot

A project plans to build a campus of buildings. Which of the following strategies should the project team consider to reduce energy demand?

A.

Purchase carbon offsets

B.

Design buildings to shade each other

C.

Enroll in a demand response program

D.

Select HVAC equipment without refrigerants

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

A.

Deep cleaning all surfaces during occupant move-in

B.

Keeping material containers open during construction

C.

Specifying and installing low-emitting materials at the source

D.

Keeping doors and windows open after installation of interior finishes

As of 1996, the Montreal Protocol banned the production of what chemical compound known to have ozone-depleting potential?

A.

Chlorofluorocarbons (CFCs]

B.

Hvdrofluorocarbons (HFCs)

C.

Hvdrofluorocarbons Phaseout Management Plan (HPMP)

D.

Hvdrochlorofluorocarbons (HCFCs)

What is considered as the receptacle load?

A.

The electrical current drawn by regulated and non-regulated receptacles

B.

The electrical current drawn by the individual receptacle connected to a standby battery

C.

The electrical current Which is non-regulated and has major impact on the load 0t the overall network

D.

The electrical current drawn by all equipment that is connected to the electrical system via a wall outlet

Which of the following best helps a project team determine access to quality transit? raj Calculator

A.

Access to parking

B.

The surrounding density

C.

The quantity of functional entries in a building

D.

The availability and frequency of public transportation

Which action promotes pedestrian access to a project site?

A.

Placing a low speed limit in the parking lot around the building

B.

Providing shuttle access between the project site and a local transit center

C.

Designating parking spaces closest to the building for exclusive use by carpooling vehicles

D.

Utilizing an existing community nature path connecting the building to surrounding buildings

Which of the following energy end-use types offer the greatest opportunity for energy consumption reduction in new commercial office building?

A.

Ventilation

B.

Refrigeration

C.

Space heating

D.

Office equipment

According to a study completed by the Heschong Mahone Group, which of the following Indoor Environmental Quality strategies can improve student test scores in schools by 7%-18%?

A.

Installing ergonomic furniture

B.

Putting plants in the classroom

C.

Providing increased dayliqhting

D.

Using thermal comfort controls

What is the scope of the LEED impact category component Protect Human Health from Direct Exposure to Negative Health Impacts?

A.

Building occupants during use and demolition phase of the building cycle, within the project boundary

B.

Occupants and construction crew during construction or renovation phase of the building cycle, within the project boundary

C.

Design and construction crew during the construction phase, within the project boundary and excluding its immediate surroundings

D.

Building occupants and design and construction crew during the construction phase and use phase ol the building cycle, within the project boundary and its immediate surroundings

Which of the following negative impacts on the environment are a result of waste being transported/diverted to landfills?

A.

Increased pre-consumer recycled content

B.

Decreased post-consumer recycled content

C.

Waste is incinerated and used to generate energy

D.

Solid waste produces methane and potent greenhouse gas