Prepare effectively for your USGBC LEED-Green-Associate LEED Green Associate Exam (LEED GA) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 5
Total 320 questions

Lighting controls are typically installed in buildings in order to

A.

provide a uniform light level across every space in a building

B.

prevent building occupants from making changes to the light levels

C.

improve occupant comfort and save energy throughout the building

D.

filter glare produced by overhead fixtures and prevent ultraviolet radiation from reaching building occupants

In the context of a LEED project, the charrette is a

A.

set of preliminary design specifications submitted by project team members

B.

forum at which the final schematic of the project is presented to the community

C.

procedure through which experts are selected to participate on the project team

D.

meeting of stakeholders, project team members and others to establish project objectives

LEED considers products to be environmentally preferable materials when they are

A.

cost effective

B.

transported by air rather than rail

C.

materials with more life-cycle impact

D.

locally extracted, manufactured and purchased

What standard addresses Indoor Environmental Quality?

A.

ASHRAE 90.1

B.

ASHRAE 62.1

C.

Energy Policy Act of 1992 (EPAct of 1992)

D.

The Montreal Protocol

What is the process that is performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use?

A.

Energy modeling

B.

Retrocommissioning

C.

Life-cycle assessment

D.

Fundamental Commissioning (Cx)

In which LEED rating category does Built Project fall into?

A.

LEED for Operations and Maintenance

B.

LEED for Interior Design and Construction

C.

LEED for Building Design and Construction

D.

LEED for Neighborhood Development

What is the minimum gross floor area required for a Building Design and Construction (BD+C) project to be eligible for certification?

A.

250 ft2 (23 m2)

B.

500 ft2 (46 m2)

C.

750 ft2 (70 m2)

D.

1000 tt2 (93 m2)

Which of the following results from incorporating sustainable landscape design?

A.

Decreased maintenance costs

B.

Encouraged use of exotic plants

C.

Restored and regenerated habitat

D.

Increased use of pesticides and irrigation

Which industry benchmarking tool is used for measuring ongoing energy performance?

A.

Bright Power's EnergyScoreCard

B.

U.S. Department of Energy's EnerCop

C.

EPA's ENERGY STAR Portfolio Manager

D.

U.S. Department of Energy's EnergyIQ

In which LEED rating category does a Built Project fall into?

A.

LEED for Building Design and Construction

B.

LEED for Interior Design and Construction

C.

LEED for Operations and Maintenance

D.

LEED for Neighborhood Development

Which of the following is the most important phase of the integrative process?

A.

Design Phase

B.

Operation Phase

C.

Discovery Phase

D.

Construction Phase

What is a reason to clearly identify the project boundary?

A.

To define the limits of site disturbance

B.

To define the building envelope

C.

To give priority for certification to projects with a smaller footprint

D.

To determine the total area of the project classified as a brownfield

Which of the following represents a unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere?

A.

Calculator

B.

Carbon offsets

C.

Demand response

D.

Renewable energy

What is the first step in the LEED certification process?

A.

Select the rating system

B.

Submit documentation

C.

Hold a charrette

D.

Develop design documents

The Increase in air temperature in a developed area resulting from the dark surfaces of roadways, parking lots, and tarred rooftops is known as

A.

emissivity

B.

global warming

C.

greenhouse gas

D.

heat island effect

A salvaged wood door from another site qualifies under what Materials and Resources sustainable criteria?

A.

Certified wood

B.

Materials reuse

C.

Bio-based materials

D.

Waste diversion

The purpose of a life-cycle assessment in LEED is to evaluate the potential:

A.

Environmental impacts of a building through its life-cycle

B.

Cost impacts of a building through its life-cycle

C.

Safety impacts of a material through its life-cycle

D.

Human impacts of a material through its life-cycle

Which of the following accurately describes Credit Interpretation Requests (CIRs)?

A.

CIRs allow project teams to obtain technical guidance for a particular credit in the LEED rating system

B.

Use of CIRs is limited to LEED projects

C.

Any approved CIR can be used for any LEED project

D.

U.S. Green Building Council (USGBC) company members and LEED registered project team members may approve CIRs

Which of the following scenarios would potentially help a project earn the most LEED points?

A.

Renovate an abandoned shopping mall in a low-density area outside the city

B.

Build an office and apartment building near an interstate highway and an existing shopping mall

C.

Renovate a large building in a diverse, walkable business district and central transit connectivity

D.

Build a low-density project on a greenfield site outside the city in order to mitigate environmental impact

According to LEED. which of the following should be considered when locating a site for a project?

A.

Political landscape

B.

Infrastructure context

C.

Economic stability

D.

Revenue generating possibilities