Pre-Summer Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

MB-335 Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Free Practice Exam Questions (2026 Updated)

Prepare effectively for your Microsoft MB-335 Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 3
Total 232 questions

An electronics manufacturing company is transitioning from infinite capacity planning to finite capacity planning to improve scheduling efficiency and manage resource constraints effectively.

The company observes that its manufacturing process typically requires a minimum lead time of five days.

The company requires finite capacity scheduling to create realistic production schedules that account for resource limitations over a defined minimum lead time of five days.

You need to implement finite capacity planning with a time fence that aligns with the five-day manufacturing lead time.

Solution: Disable finite capacity planning for all resources.

Does the solution meet the goal?

A.

Yes

B.

No

A manufacturer uses Dynamics 365 Supply Chain Management to build bicycles.

When manufacturing releases production orders to the warehouse, the warehouse must avoid automatically releasing the bill of materials (BOM) and formula lines. The BOM and formula lines must be manually released later through a batch process.

You need to configure the functionality for the records.

At which two locations should you configure this functionality? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

item model group

B.

site

C.

warehouse

D.

legal entity

E.

production order

You are a production manager at a company which produces large batches of coffee and creamers.

After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.

You need to add 20 grams of sugar and stir the product for an additional 0.S hours.

What three actions are required on the rework order? Each correct answer presents pan of the solution.

NOTE: Each correct selection is worth one point.

A.

Manually reserve batch 120008 after estimating the batch order.

B.

Add a route operation for 0.5 run time hours of stirring.

C.

Add 20 grams of sugar to the production formula.

D.

Delete all items from the production formula except for 20 grams of sugar.

E.

Delete all route operations except for a half an hour stirring operation.

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Page: 3 / 3
Total 232 questions
Copyright © 2014-2026 Solution2Pass. All Rights Reserved