Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

C_S4CMA_2308 SAP Certified Application Associate - SAP S/4HANA Cloud public edition - Manufacturing Free Practice Exam Questions (2025 Updated)

Prepare effectively for your SAP C_S4CMA_2308 SAP Certified Application Associate - SAP S/4HANA Cloud public edition - Manufacturing certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 3
Total 159 questions

In the SAP Best Practices Scenario Make-to-Stock Production - Discrete Manufacturing (BJ5), which role can perform the following actions?

Create Planned Independent Requirements (PIRs) / Execute Material Requirements Planning / Evaluate Stock-Requirements Situation

A.

Production Planner

B.

Production Operator

C.

Warehouse Clerk

D.

Production Supervisor

You reviewed the project scope and identified the corresponding resources. Based on

the SAP Activate methodology, which activities must you perform in the Explore phase? Note;

There are 2 correct answers to this question.

A.

Define the organizational structure and chart of accounts

B.

Conduct the Fit-to-Standard analysis to identify fits and gaps.

C.

Conduct the Digital Discovery Assessment to identify fits and gaps.

D.

Use the Quality system to demonstrate SAP Best Practices processes.

Which scenario is an example of the Make-to-Stock Production with Variant Configuration (21D) scope item?

^ Make-to-stock production with variant configuration is applied for factory sale only. Production based on sales orders is triggered concurrently.

A.

A material variant is defined, produced, and put into stock to anticipate later sales. Sales orders with same characteristics can be delivered from stock.

B.

Incoming sales orders trigger make-to-stock production according to the specific characteristics of the components included in the bill of materials.

C.

Assemblies are planned, produced, and put into stock. When a sales order arrives, final assembly is triggered to produce the required quantity.

What activities are applied to the entire system and cannot be changed after

confirmation? Note: There are 2 correct answers to this question

A.

Fiscal year variant

B.

Scoping

C.

Group currency

D.

Configuration activities

What information is shown in the Display Inspection Methods app? (3 correct)

A.

Master inspection characteristics related to the inspection method

B.

Usage decision

C.

Documents that are linked to the inspection method

D.

Quality notifications

E.

Administrative data

You change the status of one of your Kanban containers on the Kanban board. How does the Kanban board sort the Kanban containers? (2 correct)

A.

Inmediately according to the status sequence (wait - empty - in process -, etc.)

B.

According to the status sequence (wait - empty - in process -, etc.) right after refresh of the list

C.

The original sequence stays as before - the changed container position is kept

D.

The changed container is moved to the first position of the original sequence

What are capabilities of the Integration of SAP Manufacturing Execution to Production Operation (2JN) scope item? (2 correct)

A.

Manage both work-in-process data and master data in one single manufacturing execution system

B.

Reschedule on alternative work center automatically in case of an unexpected downtime of the standard work center

C.

Deliver real-time transparency of production operations and KPIs with complete traceability based on as-built records

D.

Use product variants with a lot size of one and the ability to change their production sequence automatically

Page: 3 / 3
Total 159 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved