Prepare effectively for your SAP E_S4HCON2023 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 80 questions

What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

A.

Depending on the SAP S/4HANA version, there are different SI check frameworks.

B.

The SI checks are executed in the development system and the results are transported into the subsequent systems.

C.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

D.

You need to build up a SI check framework by applying SAP notes.

In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?

There are 2 correct answers to this question.

Response:

A.

Upgrading to SAP ECC 6.08 without using DMO

B.

Using DMO when applying Support Packages to SAP ECC 6.07

C.

SAP S/4HANA conversion to SAP S/4HANA 1709

D.

Updating to SAP ECC 6.07 using DMO

You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

A.

The SAP support packages that will be bound to the conversion

B.

The SAP support packages contained in the upgrade media, calculated by the maintenance planner

C.

The SAP support packages of the support package stack, calculated by the maintenance planner

D.

The SAP support packages in the download directory that are newer than the selected support package stack

You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

A.

The SAP S/4HANA Conversion is without DMO.

B.

The SAP S/4HANA Conversion includes a DMO.

C.

The start release is too old for DOC.

D.

The source database is not supported

During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

A.

SUM continues with the next phase and your modifications are kept as In the start release

B.

SUM continues with the next phase and your modifications are lost

C.

Before continuing with the next phase SUM asks for a modification adjustment transport

D.

SUM refuses to continue unless you have marked a transport request as modification adjustment transport

What is the benefit of using the file UPGANA.XML from a previous SUM run?

Please choose the correct answer.

Response:

A.

To auto-fill specific fields on selected screens on the SUM UI

B.

To make the progress information within SUM UI more accurate

C.

To repeat specific phases during the SUM run

D.

To skip selected phases during the SUM run

Which circumstances will allow SUM to run without the creation of a shadow system?

Please choose the correct answer.

Response:

A.

Using the main configuration option "Single System" when installing an Add-On

B.

Using the main configuration option "Single System" in case of an upgrade.

C.

Using the database migration option (DMO) for SUM

D.

Using the main configuration option "Standard" when applying SAP Support Packages

You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?

Please choose the correct answer.

Response:

A.

After the SUM roadmap step "Execution" is finished and before "Postprocessing"

B.

During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

C.

During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

D.

After the SUM roadmap step "Postprocessing" and post procedure steps are finished

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

A.

When performing an SAP S/4HANA conversion with DMO

B.

When performing an SAP S/4HANA conversion without u DMO

C.

When upgrading an SAP S/4HANA Server system

D.

When upgrading an SAP ECC system with DMO

During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?

There are 3 correct answers to this question.

Response:

A.

Execution of SPAU modification adjustment

B.

Execution of eCATTs for business validation tests

C.

Creation of the table structures in the new SAP HANA database

D.

Execution of SPDD modification adjustment

E.

Execution of XPRAs and AIMs

What do you need to know about the SAP ERP Upgrade and Update Guide?

There are 2 correct answers to this question.

Response:

A.

It contains a troubleshooting section

B.

It is target release specific

C.

It contains a section "free space requirements"

D.

It is a database-specific document

Which Guides contain information about SUM phases starting with "EU_CLONE_"?

There are 2 correct answers to this question.

Response:

A.

The SAP S/HANA Conversion Guide

B.

The Application Guide

C.

The major SUM Guide

D.

The DMO Guide

During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?

A.

DMO with system move

B.

Migration repetition option

C.

Table count verification

D.

Table contents compare

You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

A.

EU_IMPORT_ALL

B.

EU_CLONE_MIG_DT_CREATE

C.

EU_CLONE_MIG_SOT_RUN

D.

EU_CLONE_MIG_DT_RUN

In ICNV. How database operations synchronized between the source and the target table?

A.

Deletes are directly executed in the target table by delete trigger.

B.

AA

During a DMO procedure with SUM, after which phase is the repository first available on the target database?

Please choose the correct answer.

Response:

A.

Uptime migration (EU_CLONE_MIG_UT_RUN)

B.

ParaUel distribution (PARDIST_SHD)

C.

Downtime migration (EU_CLONE_MIG_DT_RUN)

D.

Shadow repository creation (EU_IMPORT*)

SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

A.

The path was stored in file host_profile during registration

B.

The path was stored to the environment of user adm during registration

C.

The path is taken from the URL entered in the browser to start SUM

D.

The path was stored in file sumabap conf during registration

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?

There are 2 correct answers to this question.

Response:

A.

Create "modified* versions of the objects that you need to adjust

B.

Release the transport request containing the modification adjustment

C.

Assign the transport request as a modification adjustment transport

D.

Manually activate the adjusted dictionary objects

Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

A.

The link to different patch levels to SUM

B.

AA

C.

The corrections to the SUM Guide

D.

An overview about possible upgrade paths